My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
30 112TH ST SE 2024-11-08
>
Address Records
>
112TH ST SE
>
30
>
30 112TH ST SE 2024-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2024 8:55:19 AM
Creation date
10/28/2024 8:55:19 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
30
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 3/3/2020 <br /> City of Everett Permit Services Public Works Permit#: PWW2003-001 <br /> 3200 Cedar Street, 2°° Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $167.36 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> OEUR RATH\MAN KONGKEA OEUR RATH\MAN KONGKEA <br /> 30 112TH ST SE 30 112TH ST SE <br /> EVERETT,WA,98204 EVERETT,WA,98204 <br /> PHONE: PHONE: <br /> TAX PARCEL ID M 00573600004200 SITE ADDRESS:30 112TH ST SE <br /> DESCRIPTION:WIDEN DRIVEWAY TO 30'WIDE MAXIMUM WITHIN FRONT 20'AND ADD 10'X20'GRAVEL PARKING AREA BEHIND <br /> PAVED AREA AND WIDEN DRIVEWAY CUT PER COE STANDARD 315 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 03/03/2020.Approved plans <br /> must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPPP/Plan. Remove upon completion of <br /> the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 10.This permit must be finaled in order to closeout this permit/grant a Certificate of Occupancy. Request a final inspection online by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 11. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires <br /> use of the right-of-way for municipal purposes. <br /> Public Works Permit Fee Breakdown: <br /> Paving(400SF)..............................$45.00 <br /> PW Site Inspection....................................$20.00 <br /> Stormwater System Development Fee........$102.36 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> - the City of Everett from any and all claims for damages,costs,expenses,or C310,,3/ZCZZ causes of action that may arise because of installation and maintenance of <br /> Approved for Construction(Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace public <br /> property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY'rHis PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER 15 TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.