Laserfiche WebLink
TRUCTION (IBC CH. 23 4 <br />THE STRICTURE HAS BEEN DESIGNED TO RE515T CODE PRESCRIBED VERTICAL AND LATERAL FORCES <br />AFTER THE CONSTRUCTION OF ALL STRUCTURAL ELEMENTS HAS BEEN COMPLETED, STABILITY OF THE <br />STRUCTURE IS THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR THIS RESPONSIBILITY <br />INCLUDES BUT IS NOT LIMITED TO JOBSITE SAFETY: ERECTION MEANS, AND SEQUENCES: TEMPORARY <br />SHORING, FORMWORK, AND BRACING: USE OF EQUIPMENT AND CONSTRUCTION PROCEDURES. <br />STANDARDS <br />ALL METHODS, MATERIALS, AND IWORIPIANSHIP SHALL CONFORM TO THE 20I5 INTERNATIONAL <br />BUILDING CODE (IBC) AND SEI/ASCE 1-10 'MINIMUM DESIGN LOADS FOR BUILDING AND OTHER <br />STRUCTURES AS AMENDED BY LOCAL JURISDICTION <br />PROJECT LOCATION: <br />GPS LOCATION: 41.106840 LAT, -12230150E LONGIT. <br />SITE ADDRESS: 11021 NE 15TH ST, BELLEVUE, WA W004 <br />STRUCTURAL DESIGN CRITERIA (CH. 16) <br />2� <br />I. WIND ( IBC 160E 4 ASCE 6ID ): <br />II. SEISMIC ( IBC 1613 4 ASCE 1ID-13.0 <br />110 MPH WIND SPEED (ult) <br />SEISMIC DESIGN CATEGORY - 02 <br />85 MPH WIND SPEED (85d) <br />OCCUPANCY RISK - It <br />EXP05URE - B <br />2% PE IN 50 YR ( 2006 LAT-LON ) USGS-CD: <br />IMPORTANCE FACTOR 1.. ID <br />02 SEC. (66) 1252g <br />WIND SPEED UP: KzT•100 <br />MID SEC. (91) OAS113 <br />VERTICAL FORCES - GRAVITY ( IBC 1601 4 TABLE 1601.1 ) <br />VERTICAL LOADS: <br />DEAD LOAD <br />LIVE LOAD <br />ROOF <br />ACTUAL <br />25 PSF SNOW (OR PER LOCAL JURISDICTION) <br />FLOOR <br />ACTUAL <br />40 IF F <br />GARAGE <br />ACTUAL <br />50 PSF (a 3000' WHEEL LOAD) <br />DECK <br />ACTUAL <br />40 PSF <br />SOILS AND FOUNDATION DESIGN CRITERIA (IBC CH. 18): <br />SUBSURFACE INVESTIGATION 514ALL BE REQUIRED PER 18032: FOUNDATION DESIGN SHALL BE BASED <br />IN THE A56ENCE OF A SOILS REPORT, THE PRESUMPTIVE LOAD BEARING VALUES DETERMINED BY <br />LOCAL JURISDICTION OR PER IBC TABLE 18062 SHALL BE USED: <br />I. SOIL BEARING PRESSURE 1500 PSF <br />2. ACTIVE PRESSURE - RESTRAINED 45 PCF <br />3. ACTIVE PRESSURE - UNRESTRAINED 35 PCF <br />4. PASSIVE RESISTANCE 250 PCF <br />5. COEFFICIENT OF FRICTION 035 <br />6. LOCAL FROST DEPTH 12 INCH <br />ALL FOOTINGS 5HALL BEAR ON FIRM UNDISTURBED EARTH OR COMPACTED 'STRUCTURAL SAC FILL'. <br />AREAS OVER EXCAVATED SHALL BE BACKPLLED WITH LEAN CONCRETE (Nc • 20M PSI) OR <br />STRUCTURAL BACK FILL. <br />CONG��(I�CH. 19 4 ACI 318-IUIS 4 ACI 318-IU <br />CONCRETE: SHALL BE MADE WITH PORTLAND CEMENT ASTM C-150 TYPE II OR TYPE I AND SHALL BE <br />READY -MIXED PER ASTM C-54, MAXIMUM SLUMP 5'. MINIMUM CEMENT CONTENT 5U2 SACKS PER YARD <br />PROVIDE 5%-l% AIR -ENTRAINED CONCRETE FOR CONCRETE Me • 3000 F51) EXPOSED TO WEATHER <br />MINIMUM SPECIFIED COMPRESSIVE STRENGTH (c AT 28 DAYS) IBC TABLE IW42 <br />USE OR LOCATION OF CONCRETE CONSTRUCTION: <br />F'c (PSI) <br />SPECIAL INSPECTION <br />4 TESTING REQUIRED <br />FOOTING PADS 4 FOUNDATIONS NOT EXPOSED i0 WEATHER <br />2,500 <br />NOT REQUIRED <br />PORCHES, PATIOS, DRIVEWAYS, AND GARAGE SLAB <br />3000 <br />NOT REQUIRED <br />FOUNDATION STEM WALLS AND INTERIOR SLABS ON GRADE <br />2,500 <br />NOT REQUIRED <br />CONTRACTOR 5HALL HAVE AVAILABLE ON SITE A CONCRETE BATCH TICKET OR RECEIPT OF DELIVERY <br />FOR MIX OF 3000 PSI OR GREATER FOR BUILDING INSPECTOR VERIFICATION IF REQUESTED. <br />REINFORCING STEEL: REINFORCEMENT 5HALL CONFORM i0 ASTM A-615,'DEFORMED AND PLAIN BILLET <br />STEEL BARS FOR REINFORCING STEEL'. BARS SHALL BE GRADE 60 EXCEPT THAT NO. 3 AND 4 MAY <br />BE GRADE 40. BARS 5HALL BE DEFORMED, SPLICE SHALL BE 24 BAR DIAMETERS OR 18' MINIMUM. <br />PROVIDE CORNER BARS FOR ALL HORIZONTAL BARS IN WALLS AND FOOTINGS AT INTERSECTIONS. <br />MILL TICKET FOR REINFORCING BARS 514ALL BE MADE AVAILABLE TO THE BUILDING INSPECTOR AND <br />ENGINEER OF RECORD FOR VERIFICATION IF REQUESTED. <br />WIRE FABRIC SHALL CONFORM i0 ANSI/ASTM A-185, STEEL WELDED WIRE FABRIC PLAIN FOR CONCRETE <br />PLACEMENT. <br />CONCRETE ACCESSORIES: <br />ANCHOR BOLTS, BARS AND RODS SHALL CONFORM TO ASTM A-301' 'LOW CARBON STEEL EXTERNALLY <br />AND INTERNALLY THREADED FASTENERS'. <br />CAST -IN -PLACE COLD -FORM STEEL CONNECTORS IN CONCRETE FOR LIGHT FRAME CONSTRICTION <br />SHALL BE MANUFACTURED B7 SIMPSON STRONG -TIE AS SPECIFIED IN THE CURRENT SIMPSON <br />STRONG -TIE ICC ES OR IARNO ES REPORT. ALTERNATE PRODUCTS SHALL BE SUBMITTED TO THE <br />STRUCTURAL ENGNEER FOR REVIEW AND WRITTEN APPROVAL. REQUEST FOR SUBSTITUTION WILL ONLY <br />BE APPROVED WITH CURRENT ICC ES OR IAPMO ES REPORT AND A LIST STATING THE PROPOSED ITEM <br />SUBSTITUTION WITH EQUIVALENT OR GREATER LOAD CAPACITY. IN ADDITION, 6UB5TITUTIONS WILL BE <br />REQUIRED TO COMPLY WITH THE CURRENT ICC ACCEPTANCE CRITERIA, AC358 (CAST -IN -PLACE <br />COLD -FORMED STEEL CONNECTORS IN CONCRETE FOR LIGHT FRAME CONSTRUCTION) <br />PROPRIETARY CAST -IN -PLACE ANCHOR BOLTS SHALL BE '85' AND 'SBTB' ANCHOR BOLTS <br />MANUFACTURED BY 51MP90N STRONG -TIE A5 SPECIFIED ON THEIR LATEST CATALOG AND ICC ESR-2611. <br />SUBSTITUTION PROPOSED BY THE CONTRACTOR SHALL BE SUBMITTED WITH A CURRENT ICC E6 REPORT <br />TO THE STRUCTURAL ENGINEER FOR REVIEW AND WRITTEN APPROVAL. IN ADDITION, SUBSTITUTION$ WILL <br />BE REQUIRED TO COMPLY WITH THE CURRENT ICC ACCEPTANCE CRITERIA, AC3$$ (CAST -IN -PLACE <br />PROPRIETARY BOLTS IN CONCRETE) <br />EXPANSION ANCHORS (WEDGE ANCHORS) SHALL BE AS NOTED ON PLANS. INSTALLATION SHALL BE IN <br />ACCORDANCE WITH MANUFACTURE'S RECOMMENDATIONS. WHEN NOTED ON CONSTRUCTION DOCUMENTS, <br />INSTALLATION SHALL BE SPECIAL INSPECTED. <br />NON -SHRINK GROUT: MASTER BUILDERS TMASTERFLOW $28 OR PRE -APPROVED EQUAL GROUT MAY BE <br />PLACED FROM A 25 SECOND FLOW TO A STIFF PACKING CONSISTENCY. FILL OR PACK ENTIRE SPACE <br />UNDER PLATES OR SHAPES. NO GROUTING SHALL BE DONE BELOW 40 DEGREES F. <br />EPDXY GROUT: SIMPSON STRONG -TIE 'SET', COVERT OPERATIONS 'CIA' GEL, OR PRE -APPROVED <br />EQUAL. TWO PART LOW SAG EPDXY. USE EQUIPMENT, WHICH SHALL ACCURATELY MIX AND DISPENSE <br />THE COMPONENTS. HOLES SHALL BE DRILLED AT THE DIAMETER AS SPECIFIED BY THE <br />MANUFACTURER BASED ON THE DOWEL BAR OR THREADED ROD DIAMETER HOLES SHALL BE DRY <br />AND CLEANED WITH PRESSURIZED AIR JUST PRIOR TO INSTALLING GROUT. THE REBAR DOWEL OR <br />THREADED ROD 5HALL BE CLEAN AND INSTALLED SLOWLY, AND SHALL BE ROTATED AS IT IS <br />PUSHED INTO THE HOLE. COLD WEATHER GROUTING SHALL BE DONE WITH PROPER GROUT FORMULA <br />EMBED (9) DIAMETERS MINIMUM UNLESS NOTED OTHERWISE IN PLANS AND DETAILS. GROUTING <br />OPERATION 5HALL BE INSPECTED BY AN AGENT AS RECOMMENDED BY THE OWNER <br />GENERAL REQUIREMENTS: PROVIDE MINIMUM NAILING PER 2015 IBC TABLE 2304.9.1 OR MORE, A6 <br />OTHERWISE SHOWN. PRESSURE TREAT ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY. <br />PROVIDE OJT WASHERS WHERE BOLT HEADS, NUTS AND LAG SCREW HEADS BEAR ON WOOD. DO <br />NOT NOTCH OR DRILL STRUCTURAL MEMBERS, EXCEPT AS ALLOWED B7 IBC SECTIONS 2308.10.42 <br />OR AS APPROVED PRIOR TO INSTALLATION. <br />WOOD SHEATHING: SHALL BE STRUCTURAL N PLYWOOD OR ORIENTED STRAND BOARD. PLYWOOD <br />SHALL BE GROUP I OR GROUP 2 SPECIES, C-D GRADE EXPOSURE I CONFORMING TO PS 1.63. <br />EACH PANEL 644ALL BEAR THE GRADE TRADEMARK OF THE AMERICAN PLYWOOD ASSOCIATION. <br />ORIENTED STRAND BOARD (065) SHALL BE APA RATED STRUCT: I FOR ROOF AND WALLS AND APA <br />RATED STURDY-1-FLOOR FOR FLOORS, EACH PANEL SHALL BE CLASSIFIED AS EXPOSURE I AND <br />SHALL BEAR THE GRADE TRADEMARK OF THE AMERICAN PLYWOOD ASSOCIATION (APA). <br />FRAMING LUMBER <br />STANDARDS: CONFORM TO WEST COAST LUMBER INSPECTION BUREAU (WCLIB), OR WESTERN WOOD <br />PRODUCTS ASSOCIATION (WWPA). EACH PIECE SHALL BEAR THE SCL15 OR WUPA GRADE TRADE- <br />MARK <br />SPECIES AND GRADE - BASE DESIGN VALUES ( PSI) per NOS <br />STRUCTURAL ELEMENT <br />SPECIES/GRADE <br />Tbx <br />TVx <br />Tc, <br />Fc <br />Ft <br />E <br />I. <br />6x BEAMS FWD HEADER$ <br />OF NO.2 <br />815 <br />110 <br />625 <br />600 <br />425 <br />13000M <br />2. <br />4x BEAMS AND HEADER$ <br />OF NO.2 <br />500 <br />160 <br />625 <br />1350 <br />525 <br />1600000 <br />3. <br />2x JOIST <br />HF NO, 2 <br />860 <br />150 <br />405 <br />1300 <br />525 <br />1300000 <br />4. <br />6x POST <br />OF NO. 1 <br />1200 <br />110 <br />625 <br />1000 <br />825 <br />1600000 <br />5. <br />4X POST <br />OF NO.2 <br />650 <br />I80 <br />625 <br />1400 <br />500 <br />1600000 <br />6. <br />5kx6 GLU-LAM POST <br />24F-V4, 24F-VO <br />2400 <br />126D <br />650 <br />1 1650 <br />1100 <br />1100000 <br />1. <br />GLU-LAM BEAM <br />24F-V4, 24F-VB <br />2400 <br />265 <br />650 <br />1650 <br />1100 <br />1800000 <br />8. <br />31x2x OR 5Usx PSL BEAM <br />PARALLAM PSL <br />2500 <br />2W <br />150 <br />2900 <br />- <br />200WOO <br />S. <br />3V2x OR 5U4x LVL BEAM <br />MICROLLAM LVL <br />2600 <br />285 <br />150 <br />2510 <br />- <br />1500000 <br />10. <br />3U2x OR 51/4x LSL BEAM <br />TIMBERSTRAND LSL <br />1100 <br />400 <br />680 <br />1400 <br />- <br />1300000 <br />11. <br />2x WALL FRAMING <br />HIP NO.2 <br />850 <br />150 <br />405 <br />1300 <br />525 <br />1 1300000 <br />12. <br />2x WALL FRAMING = 15FT <br />OF NO. 1 <br />1000 <br />I80 <br />625 <br />1500 <br />6T5 <br />1100000 <br />GLUE -LAMINATED MEMBERS: CONFORM TO ANSI/AITC AIWI MEMBERS SHALL BE COMBINATION <br />24F-V4 DOUGLAS FIR FOR SIMPLE SPANS, 24F-V8 DOWLAS FIR FOR CANTILEVERED 61-ANS WITH <br />EXTERIOR GLUE. <br />I-JOISTg: SHALL BE TRUE JOIST MACMILLAN, OR APPROVED EQUAL, AS INDICATED ON THE <br />STRUCTURAL DRAWINGS. I -JOISTS SHALL BE MANUFACTURED IN ACCORDANCE WITH A CURRENT <br />ICBO REPORT AND APPROVED SHOP AND INSTALLATION DRAWINGS. <br />IWOD CONSTRUCTION CONNECTORS: SHALL BE MANUFACTURED BY SIMPSON STRONG -TIE AS <br />9PECIFED IN THEIR LATEST CATALOG. PROVIDE MAXIMUM SIZE AND QUANTITY OF NAILS, BOLTS, OR <br />SCREWS SPECIFIED ON CONNECTOR HARDWARE. CONTRACTOR'S PROPOSED SUBSTITUTION OF OTHER <br />MANUFACTURES CONNECTORS SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW AND <br />WRITTEN APPROVAL PRIOR TO ORDERING. REQUESTS FOR SUBSTITUTION SHALL INCLUDE CURRENT MCC <br />AND/OR IAPMO ES REPORTS AND A LIST STATING THE PROPOSED ITEM -FOR -ITEM SUBSTITUTION HAS AN <br />EQUIVALENT OR GREATER LOAD CAPACITY. IN ADDITION, 8 B$ NITS ?SNIT TITIQ� SHALL COMPLY WITH CURRENT <br />ICC ACCEPTANCE CRITERIA AC13 AND/OR IAPMO EVALUATION CRITERIA 002-2001 FOR JOIST HANGERS <br />AND SIMILAR DEVICES AND ICC AC SS FOR HOLOOUNS AND TENSION TIES. BOLTS IN WOOD <br />CONNECTORS SHALL CONFORM TO ASTM A-301, GRADE A <br />,gjR1CTURAL WOOD SCREWS: WHERE SPECIFIED OR REQUIRED BY SPECIFIC HARDWARE, SCREWS SHALL <br />BE 'SDS' STRONG -DRIVE SCREWS MANUFACTURED BY SIMPSON STRONG -TIE AS SPECIFIED IN THEIR <br />LATEST CATALOG AND ICC ESR-2236. SUBSTITUTION PROPOSED BY THE CONTRACTOR SHALL BE <br />SUBMITTED WITH A CURRENT ICC ES REPORT TO THE STRUCTURAL ENGINEER FOR REVIEW AND WRITTEN <br />APPROVAL. IN ADDITION, SUBSTITUTIONS SHALL COMPLY WITH CURRENT ICC ACCEPTANCE CRITERIA <br />AC233 (ALTERNATE DOWEL TYPE THREADED FASTENERS) <br />REQUIREMENTS FOR FASTENERS IN TREATED MATERIAL: ALL HARDWARE AND FASTENERS IN <br />PRESSURE TREATED MATERIAL 5HALL BE SIMPSON GI85 HDG (HOT DIPPED GALVANIZED) OR <br />5ST300 STAINLESS STEEL CONNECTORS OR EQUIVALENT. <br />HOT DIPPED GALVANIZED FASTENERS SHALL BE USED WITH GI85 Z-MAX AND HDG CONNECTORS AND <br />STAINLESS STEEL FASTENERS SHALL BE USED WITH 66T300 CONNECTORS. DO NOT USE STAINLESS <br />STEEL FASTENERS WITH GI 85 Z-MAX OR HDG CONNECTORS. <br />ALL ANCHOR BOLTS, WASHERS, AND NUTS SHALL BE HOT DIPPED GALVANIZED. <br />NOT DIPPED OR STAINLESS STEEL NAILS MUST BE USED WHEN FASTENING SHEATHING, STUDS, AND <br />JOIST INTO TREATED MUDSILL. HOT DIPPED GALVANIZED OR STAINLESS STEEL FASTERES SHALL BE <br />USED WHEN FASTENING DECKING TO TREATED MEMBERS. <br />INSPECTION: (IBC CH. I SECT. 110 ) <br />CONSTRUCTION SHALL BE SUBJECT TO INSPECTION BY THE BUILDING OFFICIAL AND SUCH <br />CONSTRICTION OR WORK SHALL REMAIN ACCESSIBLE AND EXPOSED FOR CONTINUING INSPECTION <br />UNTIL APPROVED. THE OWNER OR CONTRACTOR SHALL NOTIFY THE BUILDING OFFICIAL TO MAKE THE <br />INSPECTIONS SET FORTH IN SECTIONS 1103J THROWN 1103JO. INSPECTION REQUESTS SHALL BE THE <br />RESPONSIBILITY OF THE BUILDING PERMIT HOLDER WORK SHALL NOT PROCEED BEYOND THE POINT <br />INDICATED IN EACH SUCCESSIVE INSPECTION WITHOUT OBTAINING THE APPROVAL OF THE BUILDING <br />OFFICIAL. THE BUILDING OFFICIAL SHALL INDICATE ANY OF CONSTRICTION THAT 18 SATISFACTORY AS <br />COMPLETED, OR NOTIFY THE CONTRACTOR ANY PORTIONS THAT ARE NOT IN COMPLIANCE TO THIS <br />CODE. ANY PORTIONS THAT DO NOT COMPLY SHALL BE CORRECTED BY THE CONTRACTOR AND <br />SUCH PORTION(S) SHALL NOT BE COVERED OR CONCEALED UNTIL AUTHORIZED OR SIGNED OFF BY <br />THE BUILDING OFFICIAL. <br />FOOTING SCHEDULE (1500 PSF BRS.) F'c = 2500 psi <br />DIMENSION (INCHES) <br />REINF. <br />ALLOWABLE <br />TYPE <br />LOAD (KIPS) <br />'L' <br />W. <br />THK <br />LONGIT. <br />iRAN9V. <br />i <br />24' <br />24' <br />10' <br />(3)'4 <br />(3)'4 <br />55 K <br />24' DIA <br />10' <br />(2)'4 <br />(2)'4 <br />43 K <br />36' <br />36' <br />10' <br />(3)'4 <br />(3)'4 <br />12.4 K <br />F3D �i <br />42' <br />42' <br />12' <br />(3)-4 <br />(3)'4 <br />165K <br />F351 <br />46' <br />48' <br />12' <br />(3) 5 <br />(3) 5 <br />21b K <br />F40 <br />36' <br />24' <br />10' <br />(3)'4 <br />(3) W <br />83 K <br />SPREAD FOOTING; DETAIL_ <br />'W' <br />PLAN <br />NOTE: <br />AREAS NOT <br />MINIMUM SHE <br />PLATE NAIL[ <br />SPACING. S <br />SCHEDULE N <br />(THIS SHEET, <br />SOLE F <br />SC14ED <br />FLC <br />PL <br />BLOCKING REQUI <br />ALL HORIZONTAL <br />PW EDGES - SIZE <br />MAIN FLOOR JOIS <br />(NOT RE.. AT 5 <br />CONDITION) - <br />DOUBLE TOP PLATE - MIN. LAP SPLICE GIRDER TRUSS <br />SHALL BE l'-0' -NAIL W/ 10d 4' O.C. PER PLAN <br />TRUSSES OR RAFTERS ABUTTING VERTICAL PW SPECIAL SHEAR WALL PANELS <br />3 EDGE FRAMING - SIZE ROOF SNTG.PER SCHEDULE SEE SCHEDULE FOR NAILING 2x BLOCKING (ttP.) <br />� g3 <br />AND HOEDOWN TYPES <br />- <br />I� <br />��%�%I%ICI-�i�.i�l�/I�_ <br />���___/��_��_ <br />I���_ I�_ <br />I-%_ <br />I�_II�_ <br />I►%� <br />• <br />• <br />- <br />III%��l%d�ll%II <br />Iji'�I�I <br />I <br />I/I/II/I <br />d/II/II <br />© <br />® <br />Ij�1�01�1� <br />II <br />�/Ijl, <br />/III% <br />�!/II <br />III <br />I <br />� <br />I� <br />/II <br />II� <br />/I/ <br />II <br />III <br />I�Ir <br />II <br />��I <br />II <br />I,I■II <br />- <br />I� <br />I�I�I%/q- <br />I� <br />I---�€"=+I���rl�'91,%�/,;I <br />�� <br />I�I�!_�IIII�■I/II����Ir�,iF�.ds%..[!_ <br />I{ <br />'I� ilk/ <br />I�I�IFI1/I�O.1,%_., <br />I► <br />Ili/ <br />Rill'il <br />�� <br />I/ <br />Pop <br />FF <br />IlIiI <br />,IlIA <br />% <br />k.I � <br />�d�III <br />�jlMPSON <br />MSTC&653 <br />IFII STRAP III�III�I�III� <br />%A� <br />!e%I• <br />F,I�.I�I�I�III <br />III <br />I� <br />j1 <br />III�III�I <br />Ir'� <br />I� II <br />III/Ili/I/Ijl/I/ill <br />� <br />�II��/I`I�V�III <br />III/III/ <br />��II�1��14 <br />mill <br />► �Il/I' <br />I <br />III <br />IhI <br />�I <br />Dlj <br />I <br />r/ail <br />ill�t/11iE <br />i�001P©/IIii1. <br />,i_ <br />������������w�� <br />�� <br />��II'��il%�.Ideil��I�I�I�IiI�Iiii <br />/ <br />PAN <br />% <br />i P <br />%' 0 AB.'6 - EMBED T' MIN. -SPACE <br />PER SHEAR WALL SCHEDULE �� <br />NOTE: THIS ELEVATION DOES NOT REPRESENT A SPECIFIC SHEAR WALL TYPE OR LOCATION. REFER TO THIS <br />DETAIL FOR VARYING SHEAR WALL CONDITIONS, I.E. SHEAR WALL CONNECTION FROM SECOND FLOOR TO MAIN <br />FLOOR SEE TO SHEAR WALL SCHEDULE FOR SPECIFIC NAILING, 14OLDM TYPES, AND FRAMING SIZES. <br />'LONGIT.' <br />REINF. <br />ELEVATION - TWO STORM' FRAMING OR SHEAR WALL (HATCHED) <br />51, <br />544 <br />2X KING STUD <br />TYP. <br />SIMPSON HI (TYPJ <br />BOUNI EDGE FRAMING <br />PER SHEAR WALL SCHEDULE <br />ADDITIONAL STUDS <br />BELOW GIRDER TRUSS <br />PER PLAN <br />N' FLOOR SHTG. <br />I� <br />MST STRAPS <br />PER PLAN <br />�-- FLOOR JOISTS <br />PER PLAN <br />I <br />C <br />S3 <br />BOUNDARY EDGE FRAMING <br />PER SCHEDULE <br />'HD' BOLTED HOLDOLLN <br />AT FOUNDATION AS <br />READ. PER PLAN <br />- '4' FLOOR SHTG. <br />-SIMPSON PAB <br />HOLD DOWN BOLT - <br />ADDITIONAL EDGE FRAMING AND HOLDOWN <br />REQUIRED BELOW EDGE OF UPPER FLOOR <br />SHEAR WALL - SEE PLAN IF REGD. <br />&x 4x <br />V/i GL 3112 GL <br />5�4 LVL 31r2 LVL <br />MST21 ABOVE BM. <br />OR SIDE OF PLATE <br />H25 <br />H25 <br />PLATE WT. <br />S y GL <br />31y LVL <br />2X KING STUD 0d 12' <br />11'P. STAGGER -� <br />-(3) 2x CRIPPLES _�- (2) 2, CRIPPLES �-(4) 2x CRIPPLES � (3) 2x CRIPPLES <br />DROPPED BEAM <br />(3) 2X BUILT-UP POST <br />MIN. OR PER PLAN DETA I L <br />2 <br />TJI OR �j_MMUALTTC"14LA' <br />STUDS - <br />SAIW JOISTA BOVE <br />PLATE HT. <br />BUILT-UP POST <br />MATCH ABOVE <br />CASEI- BLKG BELOW UPPER FLOOR <br />2X BUILT-UP POST <br />'TRAN,51. SOLID POST PER PLAN <br />REIFF. <br />MULTIPLE STUDS - <br />TJI JOIST MATCH ABOVE <br />MUDSILL <br />-,•a�9TEM,WALL ' <br />3 DETAIL <br />1' = I'-O. <br />FLUSH BEAM <br />m <br />di <br />f] <br />VSC <br />Project A' <br />12318 <br />Sheet <br />CITY OF EVERE i T S 1 <br />REVIEWED FOR PERMI:� <br />