My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2122 106TH ST SW 2025-03-12
>
Address Records
>
106TH ST SW
>
2122
>
2122 106TH ST SW 2025-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 7:36:37 AM
Creation date
10/28/2024 10:45:11 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2122
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 System Development Fee Calculations <br />Permit #: PW1904-034 <br />Additional Notes: <br />Project Address: 2122 106TH ST SW <br />Project Name: NEW SFR AND GARAGE <br />Answer the Following Questions (Required): All Yellow Inputs <br />Water District: Everett <br />Sewer District: Everett <br />_ _ <br />Prepared '' J' Date: ZD� <br />Outside City Limits? No *Adds a 25%Surcharge <br />Supportive Housing Credit? No *Reduces by80% <br />u% <br />Reviewed By: Date: i, %S �! <br />Fee Calculations: <br />Water & Sewer System Development Fees: <br />Domestic Meter: Fee Calculation (Before Credit): <br />Credit Calculations (Up to 3 meters for Meter -Based Calculation or 3 previous building uses for Administrative Guidelines -Based Calculation): <br />*Subject to Administrative Guidelines Proposed Building Use: <br />SFR/Townhome Previous Bldg Use #1: SFR/Townhome Previous Bldg Use #2: No Other Use <br />Previous Bldg Use #3: <br />No Other Use <br />ProposedUnit Measure: <br />1 Unit Unit Measure for Use #1: 1 Unit Unit Measure for Use #2: None <br />Unit Measure for Use #3: <br />None <br />Note: Meter Size Used for Proposed Meter Size: <br />3/4" Credited Meter #1 Size: 3/4" Credited Meter #2 Size: None <br />Credited Meter #3 Size: <br />None <br />Calculation Water Fee: <br />$3,957.00 Water Credit #1: $3,957.00 Water Credit #2: $0.00 <br />Water Credit #3: <br />$0.00 <br />Sewer Fee: <br />$5,121.00 Sewer Credit #1: $5,121.00 Sewer Credit #2: $0.00 <br />Sewer Credit #3: <br />$0.00 <br />Total Fees Due: Add to Utility Permit for Domestic Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Sewer Sys Dev Fee Total: <br />$0.00 <br />This fee reflects credit for existing water meter <br />Total: <br />$0.00 <br />Irrigation Meter: Fee Calculation (Before Credit): <br />Credit Calculations: <br />Proposed Meter Size: <br />None Credited Meter Size: None <br />Water Fee: <br />$0.00 Water Credit: $0.00 <br />No Sewer Fee: <br />$0.00 No Sewer Credit: $0.00 <br />Total Fees Due: Add to Utility Permit for Irrigation Meter <br />Permit #: U Water Sys Dev Fee Total: <br />$0.00 This fee reflects credit for existing water meter <br />No Sewer Sys Dev Fee: <br />$0.00 <br />Irrigation meters are only subject to the water portion of system development fees <br />Total: <br />$0.00 <br />Fire Meter: Proposed Meter Size: <br />None <br />For informational purposes only <br />Permit #: U No Sys Dev Fees: <br />$0.00 <br />Fire meters are not subject to system development fees <br />Stormwater System Development Fees: <br />Permit #: G i8 O ' a f (D Type of Construction: New Construction/Redevelopment <br />Square Feet of New Plus Replaced Hard Surfaces: <br />4,629 SF <br />Stormwater System Dev Fee: <br />$1,151.48 Add this fee to the Building Permit (or Public Works Permit if there is no building permit for the project) <br />
The URL can be used to link to this page
Your browser does not support the video tag.