My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2122 106TH ST SW 2025-03-12
>
Address Records
>
106TH ST SW
>
2122
>
2122 106TH ST SW 2025-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 7:36:37 AM
Creation date
10/28/2024 10:45:11 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2122
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
►onding height <br />POST SPACING: <br />max. 24" <br />T' max. on open runs <br />4' max. on pooling areas <br />Attach fabric to ' <br />upaLream alde of post <br />FLOW— <br />Kid— over ash emetler <br />POST DEPTH: <br />slit fence 2 to 4 mes <br />As much below ground <br />MM devlcs exertlrtg ; <br />as fabric above ground <br />80 p.s.l. er greater ; <br />t Do% compacticpt <br />400%compaction <br />\> \\%\\� <br />No more than 24" of a 36fabric <br />is allowed above ground. <br />................................. Top of Fatxic <br />Belt <br />top 8. <br />I <br />Diagonal anachment <br />doubles 910rigth. <br />Li <br />ATTACHMENT DETAILS: <br />• Gather tatmic at posts, i needed. <br />• Utilize three ties per post. an within top For fabric. <br />• Postilion each tie diagonally, punctoing holes vertically <br />a minwnLwn of 1' apart. <br />• Hang each tie on a post nipple and tighten securely. <br />tise cable Des ($013s) or SOQ a e. <br />Roll of sit fence <br />Horizontal chisel point Siting blade <br />(76 mm width) (18 min width) <br />Vibratory plow is not acceptable because of horizontal compaction <br />lion <br />Sit Fence <br />Completed Installation <br />Figure 4.2.13 — Silt Fence Installation by Slicing Method <br />Maintenance a Repair any damage immediately. <br />Standards Intercept and convey all evident concentrated flows uphill of the silt <br />fence to a sediment pond. <br />Check the uphill side of the fence for signs of the fence clogging and <br />acting as a barrier to flow and then causing channelization of flows <br />parallel to the fence. If this occurs, replace the fence or remove the <br />trapped sediment. <br />Volume II — Construction Stormwater Pollution Prevention - December 2014 <br />4-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.