My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2122 106TH ST SW 2025-03-12
>
Address Records
>
106TH ST SW
>
2122
>
2122 106TH ST SW 2025-03-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 7:36:37 AM
Creation date
10/28/2024 10:45:11 AM
Metadata
Fields
Template:
Address Document
Street Name
106TH ST SW
Street Number
2122
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wearing laver <br />• For all surface types, a minimum initial infiltration rate of 20 inches <br />per hour is necessary. To improve the probability of long-term <br />performance, significantly higher initial infiltration rates are desirable. <br />• Porous Asphalt: Products must have adequate void spaces through <br />which water can infiltrate. A void space within the range of 16 — 25% <br />is typical. <br />• Pervious Concrete: Products must have adequate void spaces through <br />which water can infiltrate. A void space within the range of 15 — 35% <br />is typical.. <br />• Grid/lattice systems filled with gravel, sand, or a soil of finer <br />particles with or without grass: The fill material must be at least a <br />minimum of 2 inches of sand, gravel, or soil. <br />• Permeable Interlocking Concrete Pavement and Aggregate Pavers: <br />Pavement joints should be filled with No. 8, 89 or 9 stone. <br />Drainage conveyance <br />Roads should still be designed with adequate drainage conveyance <br />facilities as if the road surface was impermeable. Roads with base courses <br />that extend below the surrounding grade should have a designed drainage <br />flow path to safely move water away from the road prism and into the <br />roadside drainage facilities. Use of perforated storm drains to collect and <br />transport infiltrated water from under the road surface will result in less <br />effective designs and less flow reduction benefit. <br />Underdrains <br />Note that if an underdrain is. placed at or near the bottom of the aggregate <br />base in a permeable pavement design, the permeable pavement is no <br />longer considered an LID BMP and cannot be used to satisfy Minimum <br />Requirement #5. However, designs utilizing an underdrain that is elevated <br />within the aggregate base course to protect the pavement wearing course <br />from saturation is considered an LID BMP and can be used to satisfy <br />Minimum Requirement #5. See Appendix III-C and the WWHM Users <br />Manual for guidance in modeling permeable pavements with underdrains. <br />Acceptance test <br />• Driveways can be tested by simply throwing a bucket of water on the <br />surface. If anything other than a scant amount puddles or runs off the <br />surface, additional testing is necessary prior to accepting the <br />construction. <br />Roads may be initially tested with the bucket test. In addition, test the <br />initial infiltration with a 6-inch ring, sealed at the base to the road <br />surface, or with a sprinkler infiltrometer. Wet the road surface <br />continuously for 10 minutes. Begin test to determine compliance with <br />20 inches per hour minimum rate. Use of ASTM C 1701 is also <br />recommended. <br />Volume V — Runoff Treatment BMPs — December 2014 <br />5-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.