My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2133 CHESTNUT ST 2024-11-08
>
Address Records
>
CHESTNUT ST
>
2133
>
2133 CHESTNUT ST 2024-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 11:28:35 AM
Creation date
10/29/2024 11:53:25 AM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT ST
Street Number
2133
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHOTOVOLTAIC ROOF MOUNT SYSTEM 0 <br /> 09 MODULES-ROOF MOUNTED - 3.690 kW DC, 3.840 kW AC, 2133 CHESTNUT ST, EVERETT, WA 98201 infinitysolar <br /> INFINITY HOME SOLUTIONS <br /> 6405 E MILL PLAIN <br /> PHOTOVOLTAIC SYSTEM SPECIFICATIONS: SITE DETAIL: SHEET INDEX: DS 07: WIRING SPECIFICATION VANCOUVERWA9 661 <br /> UTILITY: SNO.CO.PUD PV 0.0: GENERAL NOTES AND PROJECT DATA DS 08: MOUNTING-DATA SHEET PHONE:1-800-818-0598 <br /> 3.840 0 kW AC <br /> SYSTEM SIZE: 3. kW DC MSP: EXISTING 200A MSP WITH 2O0A MAIN BREAKER PV 1.0: PLOT PLAN DS 09: RACKING-DATA SHEET INFINITY SOLAR.COM <br /> MODULE TYPE&AMOUNT: (09)ZNSHINESOLAR ZXM7-SH108-410M ROOF MATERIAL: COMPOSITE SHINGLE PV 1.1: SITE PLAN DS 10: RACKING-GROUNDING REVISIONS <br /> MODULE DIMENSIONS: (L/W/H)67.87"/44.64"/1.8" ASCE 7-10 WINDSPEEDS: (3 SEC GUST IN MPH) PV 1.2: ROOF SECTION DS 11: RACKING-CERTIFICATION <br /> Description Date Rev <br /> INVERTER: (05)AP SYSTEMS DS3-L RISK CATEGORY II: 110 MPH IM 1.0: INVERTER MAP Initial Design 4/2124 00 <br /> INTERCONNECTION METHOD: LOAD BREAKER S 1.1: MOUNT DETAILS <br /> AHJ: CITY OF EVERETT E 1.1: 3-LINE DIAGRAM <br /> E 1.2: NOTES <br /> RACKING: GRASOL RACKING SYSTEM FOR COMP ROOF E 1.3: WARNING LABELS <br /> ARRAY AREA: 21.04 SQFT x 09=189.4 SQFT DS 01: PV MODULE SPECIFICATION SHEET Signature with Seal <br /> DS 02: MICROINVERTER SPECIFICATION SHEET <br /> DS 03: COMBINER PANEL CERTIFICATION <br /> DS 04: AC DISCONNECT UL CERTIFICATION <br /> DS 05: AC DISCONNECT UL CERTIFICATION <br /> DS 06: JUNCTION BOX UL CERTIFICATION <br /> PHOTOVOLTAIC NOTES: <br /> 1.AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL WITH THE"SMACNA"-GUIDLINES FOR SEISMIC RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING <br /> DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK SYSTEMS. <br /> UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL 22.ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC LATERAL FORCE F INCLUDING Project Name& <br /> PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED.(NEC 690361) CONSIDERATION OF a A P AND rAP BE DETERMINED AT EACH LEVEL OF THE BUILDING SO THAT BRACE 2133 ut Address <br /> 2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAIN TIGHT SPACING CAN BE CALCULATED.THE DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE SEISMIC Everetk wA 9e201, - <br /> THREAD-LESS COMPRESSION TYPE. LATERAL FORCE DETERMINATION. United States <br /> 3.MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED 23.A COPY OF THE CHOSEN BRACING SYSTEM(S)INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOB <br /> 4.NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER SITE PRIOR TO STARTING THE INSTALLING OF HANGERS AND/OR BRACES. <br /> DISTRIBUTION SWITCH BOARDS,PANEL BOARDS,DISCONNECTING SWITCHES,TERMINAL CABINETS, 24.WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING L11 <br /> ETC. ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO NON-PRESTRESSED REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR z <br /> WITHSTAND THE WEATHER. DAMAGING THE REINFORCED BARS.WHEN INSTALLING THEM INTO EXISTING PRE-STRESSED CONCRETE LLJ U) o <br /> 5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION.EXERCISE EXTREME CARE N rn Q Q <br /> APPROPRIATE WATER RUN OFF. AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION.MAINTAIN A LLI Z Q Z Z <br /> 6.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR. tY H 3: t <br /> BOX/COMBINER BOXES PER APPROPRIATE NEC REQUIREMENTS. 25.THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW Z LL j F_:' z J <br /> 7.SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26. 0 _ � O Q <br /> 8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS.FIELD 26.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT.(NEC 300.6 01,310.8 D) 2 SATELLITE VIEW Q LU a- w <br /> APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 27.GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE p Cl) LU <br /> AL <br /> 9.JUNCTION,PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE DC SIDE OF THE SYSTEM.(NEC 250.97) Pv o.o SCE:NTS >_ cat w <br /> WIRING CONTAINED IN THEM CAN BE RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF 28.THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF <br /> MODULE(S)SECURED BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING SYSTEM.(NEC 690.34) SMALLER THAN#6 COPPER WIRE.(NEC 250.64 B) Q <br /> 10.IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM,THE POWER SOURCE SHALL BE LABELED WITH THE 29.GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXCEPT FOR SPLICES OR JOINTS AT 17N s <br /> FOLLOWING WARNING AT EACH JUNCTION BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE BUSBARS WITHIN LISTED EQUIPMENT.(NEC 250.64 C) Qsare ay <br /> QHenry M Jackson Park <br /> UNGROUNDED CIRCUITS MAY BE EXPOSED DURING SERVICE:"WARNING-ELECTRIC SHOCK HAZARD. 30.RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END.(CEC 250.64(E) 1sm� <br /> THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT 31.WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, 1nno on o.nadway 4M <br /> MAY BE ENERGIZED WITH THE RESPECT TO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND(NECE 690.35(F)) A SIGN WILL BE PROVIDED WARNING OF THE HAZARD PER NEC 690.17.34.EACH UNGROUNDED <br /> 11.ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED CONDUCTOR OF THE MULT-IWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER PHASE AND SYSTEM PER Sheet Name <br /> VWW r. , GENERAL NOTES <br /> FROM ANY PHYSICAL DAMAGE. NEC210.5. Qer�nkaon nms va,nr <br /> 12.ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. 32.CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC250.97&250.92(B)&LAMC 93.250.97. Parnnare n"°a dDr �pcpP i' AND PROJECT <br /> 13.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED. 33.DC CONDUCTORS EITHER DO NOT ENTER THE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR iyaki 21s 51 21stSt 9iohort1sh DATA <br /> 14.ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31(E),LAMC 93.690.31(E) <br /> 15.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTION, 34.ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS(CONDUIT, V1,„r.,,n,. tam n Sheet Size <br /> COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED JUNCTION&PULL BOXES,RACEWAY,ETC)SHALL BE SOLIDLY GROUNDED PER THE MANUFACTURER'S 2133 Chestnut St, 22nd St <br /> Everett WA98201, a ANSI B <br /> 16.DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE INSTALLATION INSTRUCTIONS LAMC 93.690.110.3&93.110.3(B). 23rd St „ united States <br /> CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 35.SCREWS,NUTS,BOLTS&WASHERS THAT ATTACH EQUIPMENT GROUNDING LUGS SHALL BE m a " " <br /> 17.IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY STAINLESS STEEL LAMC 93.110.3(B). m a c- <br /> n 11 X 17 <br /> ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS 36.NO PIPING,DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE * n <br /> RIVERSIDE <br /> Sheet Number <br /> APPROPRIATE. LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. 25thS <br /> 18.WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT,ARISES ON THE DRAWINGS OR 37.ALL FIELD INSTALLED JUNCTION,PULL AND OUTLET BOXED LOCATED BEHIND MODULES OR PANELS 25M St <br /> SPECIFICATIONS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MODULE(S)OR PANEL(S)SECURED BY 40FC Money E <br /> PV 0.0 <br /> MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN REMOVABLE FASTENERS. Services nns 26th Si <br /> THE SPECIFICATIONS TO ENDURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM 38.REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE QFooa scores Qucean sPa 26th P1 <br /> Everett Ave sz"i _ .(s a Evereniive= <br /> REQUIRED BY THE ARCHITECT/ENGINEER. BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC s <br /> 19.ALL BROCHURES,OPERATION MANUALS,CATALOGS,SHOP DRAWINGS,ETC.SHALL BE HANDED SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. Caldorne LL „,�6e s <br /> OVER TO THE OWNER'S REPRESENTATIVE AT THE COMPLETION OR WORK. 39.THE ROOF MOUNTED PHOTOVOLTAIC MODULES,PANELS,OR SOLAR VOLTAIC ROLL ROOFING <br /> 20.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT. MATERIAL SHALL HAVE THE SAME OR BETTER LISTED FIRE-RESISTANCE RATING THAN THE BUILDING <br /> 21.THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL BE IN ACCORDANCE ROOF-COVERING MATERIAL. <br /> 1 GENERAL NOTES AND PROJECT DATA 40.ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 1/2"OFF THE ROOF SURFACE. VICINITY MAP <br /> Pv 00 <br /> Pv 00 <br /> SCALE:NTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.