My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5132 27TH AVE W 2024-11-08
>
Address Records
>
27TH AVE W
>
5132
>
5132 27TH AVE W 2024-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2024 11:36:11 AM
Creation date
10/29/2024 3:54:30 PM
Metadata
Fields
Template:
Address Document
Street Name
27TH AVE W
Street Number
5132
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: M2212-034 Description: Replace existing gas furnace with new gas furnace&HP <br /> Applied: 12/7/2022 Approved: 12/8/2022 Site Address: 5132 27TH AVE W <br /> Issued: 12/9/2022 Finaled: 7/9/2024 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant: DAY&NITE PLG&HTG INC <br /> Parent Permit: Owner:SHAWN L SLACK <br /> Parent Project: Contractor: DAY&NITE PLUMBING&HTG INC <br /> Details: <br /> Located in the basement AND EXTERIOR <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 7/13/2023 7/13/2023 MECH 06-FINAL JEFF M RHODE CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> -no emergency condensate control upc 814.2 <br /> -intake and combustion to close to gas meter ensure exhaust and combustion air have required distances imc 401.4 <br /> -no screens on intakes 401.5 <br /> 7/21/2023 7/21/2023 MECH 06-FINAL JEFF M RHODE CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> -unit must be operational for final <br /> -unit intake and exhaust to close to gas meter imc 804.4.4 <br /> 7/9/2024 7/9/2024 MECH 08-FINAL** JEFF M RHODE APPRVD-PERMIT <br /> FINAL <br /> Notes: <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 7/9/2024 7/9/2024 (REASON <br /> REQUIRED) GILFEATHER APPROVED <br /> Notes: <br /> modification in supply chain <br /> I <br /> Printed:Tuesday,29 October, 2024 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.