My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2719 LEONARD DR 2024-12-09
>
Address Records
>
LEONARD DR
>
2719
>
2719 LEONARD DR 2024-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 8:23:27 AM
Creation date
10/30/2024 9:20:44 AM
Metadata
Fields
Template:
Address Document
Street Name
LEONARD DR
Street Number
2719
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From: Grace Pollard <G Pollard @everettwa.gov> <br /> Sent:Thursday, October 7, 2021 6:08 PM <br /> To:Jose Villagomez<josev@cascadescleanup.com> <br /> Cc:Abe Hernandez<abel@cascadescleanup.com>; Kitcia Hernandez<kitciah@cascadescleanup.com>; <br /> D T<chilld3@msn.com>; Rakeeb Khan <RKhan@everettwa.gov>;John Bertrand <br /> <J Bertrand @everettwa.gov>; Engineering/Public Services (PW) <evteps@everettwa.gov> <br /> Subject: RE: [EXTERNAL] Re: [EXTERNAL] RE: PLANNING INTAKE REVIEW COMMENTS_62106-009_2719 <br /> Leonard Drive <br /> Good Afternoon Jose, <br /> I have the file and plans for 2719 Leonard Drive (132106-009) in front of me and I have the following <br /> comments: <br /> 1. Site Plan.The revised site plan submitted on September 13th is still showing height calculations <br /> from the average base elevation of the proposed footprint of the dwelling (A, B, C, D). Please <br /> revise the site plan height calculations to show measurement is taken from the average sidewalk <br /> elevation at the front lot line; Site plan has been updated <br /> 2. Please ensure all necessary construction plans have included the changes to the roof pitch as is <br /> shown in the revised elevation drawings on sheet 3 and 4. (This may have already been <br /> addressed but if not please do so as soon as possible so as not to delay the building divisions <br /> review.) Building Elevations already have elevations notations noted with the sidewalk as base <br /> elevation, as previously submitted and included for your convivence. <br /> The permit is in line for review with both building and Public Works. <br /> Best Regards, <br /> - Grace Pollard <br /> Associate Planner I Planning Division <br /> Community, Planning, and Economic Development Department <br /> EVERETT 425.257.8731 2930 Wetmore Avenue, Suite 8A, Everett, WA 98201 <br /> everettwa.gov/planning Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> From:Jose Villagomez<josev@cascadescleanup.com> <br /> Sent:Thursday, September 30, 2021 9:09 AM <br /> To: Grace Pollard <G Pollard @everettwa.gov> <br /> Cc:Abe Hernandez<abel@cascadescleanup.com>; Kitcia Hernandez<kitciah@cascadescleanup.com>; <br /> D T<chilld3@msn.com> <br /> Subject: RE: [EXTERNAL] Re: [EXTERNAL] RE: PLANNING INTAKE REVIEW COMMENTS_132106-009_2719 <br /> Leonard Drive <br /> Good morning Grace, <br /> Just following up on my previous email.Thank you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.