Laserfiche WebLink
8 of 22 <br /> Saturday, July 13, 2024 <br /> A <br /> SCOPE OF WORK <br /> R&R CREW RESPONSIBILITIES & DETAILS: <br /> -Crew will install (14) Helical Piles to stabilize home only <br /> -Crew will remove and repour(10) concrete holes to allow pile installation. <br /> - Dingo accessible. <br /> HOMEOWNER RESPONSIBILITIES: <br /> - Have work area cleared where piles will be installed. <br /> - Have necessary plants removed. <br /> ADDITIONAL INFO: <br /> - R&R will handle necessary permit and engineering coordination. <br /> - 25%deposit, 25% upon issue of permit and final 50% upon completion of project. <br /> - Permit cost is not included and will be billed on second 25%deposit payment. <br /> - Responsible party representative must be onsite during crew arrival, project completion and foundation lifting if applicable. <br /> - Permitting/scheduling times may vary beyond R&R control. <br /> MATERIAL CLAUSE: <br /> - Depth Clause: Piles are bid to 25 foot maximum depth. $20 per foot charge beyond that. <br /> - Homeowner will be notified if any unexpected items arise and no additional work will be completed without homeowner <br /> approval. <br />