Laserfiche WebLink
12 of 22 <br /> PROJECT NO. NO. <br /> S240722-2XR SSK-01 <br /> PROJECT 703 Niles Ave Everett WA 98201 <br /> LONGITUDE SUBJECT Installation Detail - Ideal Helical Pile <br /> ONE TWENTYO <br /> ENGINEERING&DESIGN BY JT DATE 07/23/2024 <br /> (E)WOOD FRAMED <br /> FLOOR SYSTEM <br /> FIELD VERIFY <br /> (E)CONC STEMWALL <br /> T/STEMWALL= <br /> e • <br /> FIELD VERIFY <br /> 8"NIIN TH[CKNES S, a T/F N GRADE=h <br /> CONTRACTOR TO VERIFY mT =i I —I I — <br /> ° '. III= VARIES <br /> IIII=IIII=IIII-IIII= <br /> (E)FTG TO BE CUT FUJSH <br /> a = = = =L WLTH FACE OF STEMWALL <br /> • I I =1 I =1 1 =IIII=, <br /> WITHA 12"MAXWIDTHFOR <br /> — —IIII IIII INSTALLATION POCKET <br /> I I —I I —_IIII III=11 <br /> N �U —I I —IIII= I=IIII_ <br /> N a ,1,=1,11=11 =IIII=III. <br /> _ _ -IIII IIII-IIII-1 T/CONCFTG= OL <br /> FIELD VERIFY <br /> =IIII=IIII=I I =1 I —I I II <br /> II ° .• ° - <br /> -I —I I.—I1 ; I I =I.I.—I. <br /> I —I I =IIII III-IIII=IIII: <br /> I I —IIII=11 • ' • ' I I =IIII= <br /> �'—I'll IIII=IIII=IIII=IIII 1=IIII=IIII=IIII <br /> IIII=IIII <br /> (E)CONTINUOUS gin=IIII=l I= IDEALHEUCALPIILE&REPAIR <br /> CONC FOOTINIG BRACKET ASSEVIBLYPER <br /> NOTES: R&R FOUNDATION SPECIALIST <br /> 1. CONrRA.ORTO VERIFYNOTEDNEqNLnv1EXLSTM FOUMATION TO CONFORMTO ESR 3750 <br /> DIMENSIONS PRIOR TO INSTALLATION ENGNEER OF RECORDTO BE 2-7/8"SHAFT W/l O"DIAM <br /> NOTIFIED PRIOR TO INSTALLATION IF M MNt MS NOT NE`I. <br /> 2. ALLASSEMBLYCOMPONENIS SHALLBEFULLYSEALEDBY&CORROSION DOUBLE HELIXW/3 PITCH <br /> RESISTANrSYSTEM THIS INCLUDES ALLFINALCUTENDS ANDDRUED <br /> HOLES.CORROSION PREVENITONCOATING SYSTEMBYOTHERS.PRIl&E AND <br /> PAINr PER MFR OR GALVANIZATION PER ASTM 153/A123. <br /> 3. AT CUTINSTALIATION POCKET ALL EXPOSEDSTEELREMORCEMENr <br /> SHALL BE SEALED OR COATED TO PREVENT CORROSION <br /> 4. REFER TO GENERALNOTES FOR GEOTECfMCALPILE EMBEDMENT <br /> REQUIREMENTS. NOTE THAT THESE SHALL BE ACHEVED PRIOR TO THE <br /> APPLICATION OF THE REFUSAL CRITERIA <br /> 5.REFER TO GD�FE NOTES FOR PILE FIELD TESTING REQUIREMENTS. <br /> L120 ENGINEERING&DESIGN <br />