Laserfiche WebLink
�v Inspection <br /> DAILY FIELD REPORT <br /> Date <br /> AAR TESTING AND INSPECTION, INC. 07/24/2024 <br /> 'y 7126 180th Ave NE:,Suite C101 Report <br /> y s Redmond,WA 98052 Number <br /> 425-681-5812 JAH072424C <br /> CLIENT INFORMATION I PROJECT INFORMATION <br /> Contact Matt Prevost Project No. 24-447 <br /> Company Mr Racks LLC Project Name Cummins <br /> Address 2220 S Tacoma Way Address 3717 McDougal Ave <br /> City Tacoma City Everett <br /> Contractor Permit No. B2405-065 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> O Proprietary Anchors - Mechanical Pallet racks (see photo) <br /> Weather Temperature(OF) Start Time End Time <br /> Sunny 71 12:30 PM 02:30 PM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> project drawings sheet 2 and 3, and ESR Report 3037. <br /> C� INSPECTION OBSERVATION / REMARKS_ <br /> As requested, I was on site to inspect the installation of Simpson strong Bait 2 wedge anchors into existing concrete at the above note <br /> d <br /> locations for the pallet racks. When on site I reviewed the project drawings sheet 2 and 3, and ESR Report 3037. <br /> I verified that the approved anchors were installed to the required embedment depth of 3 7/8 inches as of drawing sheet 3. <br /> I used a calibrated torque wrench to verify tightening torque on the anchor nuts and found that the nuts were tightened to at least 60 foot <br /> pounds. <br /> Work was performed per ESR Report 3037, manufacturer's directions and the project plans. <br /> Items inspected are in conformance with approved plans,specifications,and jurisdictional requirements <br /> Inspectors Signature Inspectors Name Report Date Reviewers Reviewed By Reviewed Date <br /> James Huggins 07/24/2024 Signature Teajalam (TJ) <br /> Gounden <br />