Laserfiche WebLink
The following are the testing agencies and special inspectors that will be retained to conduct tests and inspection on this project: <br /> Responsibility Firm Address,Telephone, e-mail <br /> 1.Special Inspection Agency NA <br /> (except for geotechnical) <br /> 2. Material Testing Agency NA <br /> (Laboratory) <br /> 3.Geotechnical Inspection RILEY GROUP 17522 Bothell Way Northeast, Bothell, WA 98011 <br /> Phone 425.415.0551 <br /> Agency CMcCracken@Riley-Group.com <br /> 4.Other <br /> 5. Other <br /> rpm _ <br /> LP <br /> ECEDVE <br /> LE; 11)1 <br /> JUG 2 1 2024 0 <br /> CITY OF R E ` ' <br /> Permit Services <br /> GENERAL INFORMATION: <br /> Page 2 of 8 <br /> • Obtain a building permit before starting construction. N„__ <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that may be required per 2021 IBC. <br />