Laserfiche WebLink
. , Corp.Office:17522 Bothell Way Northeast Project No: 2013-302-2 <br /> Bothell,WA98011 <br /> 1 LU <br /> Tacoma Office:108 Broadivoy suite#1008 Report No: 006 <br /> RILEYGROUP phone425.415.055+Fax425.415.0311 RGI rep: Collin McCracken <br /> www.riley-group.com Date: 09/06/2024 Day:Thursday <br /> Permit No; B2405-015 and-016 Page No. 1 of 1 <br /> Project: Silver Lake Townhomes Repair Subject; Pile Install <br /> Location: 11020 20th Drive Southeast,Everett,WA Contractor: RDH/Pearson Drilling Inc <br /> Client Name: 3Stripe Management Superintendent Blake/Andrew <br /> &Address: 1121719th Avenue Southeast Visitors: <br /> Everett,WA 98208 Weather: Sunny High 70s <br /> OBSERVATIONS: <br /> As requested, a Riley Group representative visited the site today to observe and evaluate the following: <br /> Pearson Drilling was on-site today to install pin piles for underpinning the structure. A total of 18 two- <br /> inch pin piles were driven to refusal using a 90-pound pneumatic jackhammer. All piles were driven to a <br /> refusal criteria of 60 seconds per inch for 3 consecutive cycles. Pile install list is below Pile 1 is the <br /> northwestern most exterior P1 pile, and numbers increase to the southeast.All listed depths are <br /> approximate to cutoff depth (up to 3 feet below existing grades). <br /> Pile Depth (feet) Pile Depth (feet) <br /> 1 7.5 10 10.5 <br /> 2 7.5 11 15 <br /> 3 7 12 13.5 <br /> 4 6.5 13 10 <br /> 5 7.5 14 9.5 <br /> 6 9.5 15 8.5 <br /> 7 8.5 16 8.0 <br /> 8 10.0 17 9.0 <br /> 9 8.5 18 8.0 <br /> RGI Rep sign: C4WAIMCCMC�111 Copies To: <br /> Reviewed by: Kl"j[4(,1.J/ta/Ueue,' <br /> RGIs field representative is present on site solely to observe the field activities of the contractor identified and keep our client informed of the progress and quality of the work.The presence <br /> of our field representative and our acceptance of any non-conforming work or failure to reject any non conforming work does not relieve the contractor from complying with its contract <br /> documents.RGI does not have the authority to direct the contractor's work,Any information provided by the RGI representative is intended solely to advise the contractor of the technical <br /> requirements of the plans and specifications and/or design concept.The contractor is solely responsible for its means,methods,sequences,proredures,construction site safety,quality of <br /> work,and adherence to the coat racl documents. <br />