Laserfiche WebLink
l <br /> D) Lull= u L I)) <br /> IL <br /> CITY OF EVERETT <br /> �� JUi� 2 <br /> EVERETT Permit Services 1 2024_,�. <br /> WASHINGTON CITY OF EVERETT <br /> T <br /> POrmit Scrvico3 <br /> SUMMARY OF REQUIRED IBC SPECIAL INSPECTIONS <br /> PER 2021 INTERNATIONAL BUILDING CODE (IBC) <br /> PROJECT SILVERLAKE TOWNHOMES FOUNDATION PILING PERMIT# B2405-015 <br /> ADDRESS 11020 20TH DRIVE SE, EVERETT, WA DATE 05-22-24 <br /> Summary Statement of Special Inspections <br /> In accordance with Section 1704.2.3,the applicant shall submit a statement of special inspections as a condition for permit <br /> issuance. When special inspection is required to be performed, the owner, or the registered design professional in <br /> responsible charge acting as the owner's agent, is required to hire an independent testing/inspection agency to perform <br /> required special inspections. <br /> The independent agency hired to perform the duties of special inspection is required to be a registered agency with <br /> Washington Association of Building Officials (WABO), under the Special Inspection Registration Program (SIRP) Standard <br /> No. 1701 or most current adopted special inspection standard published by WABO. <br /> The design professional shall complete the attached forms and submit them to the Building Department prior to issuance <br /> of the building permit. The special inspectors assigned to any project within the Jurisdiction shall be currently registered <br /> with WABO and certified for the disciplines assigned. <br /> The Schedule of Special Inspections summarizes the Special Inspections and tests required. Special Inspectors will refer to <br /> the approved plans and specifications for detailed special inspection requirements. Any additional tests and inspections <br /> required by the approved plans and specifications will also be performed. <br /> A Final Report of Special Inspections documenting required Special Inspections,testing and correction of any discrepancies <br /> noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy (Section 1704.2.4). <br /> Prepared by: <br /> Registered Design Professional in Responsible Charge: BASRI BASRI PE, SE <br /> JUL 2 6 2024 <br /> CITY OF EVERETT <br /> GENERAL INFORMATION: Permit Services Page lof8 <br /> •Obtain a building permit before starting construction. <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that may be required per 2021 IBC. <br />