Laserfiche WebLink
E. Submittals to the Building Official <br /> 1. In addition to the submittal of reports of special inspections and tests by the approved special inspection <br /> agency in accordance with IBC Section 1704.2.4, reports and certificates shall be submitted by the owner or <br /> the owner's authorized agent to the building official for items listed in IBC 1704.5. <br /> F. Jurisdiction <br /> 1. The Jurisdiction will review the implementation of Structural Tests and Special Inspection requirements. <br /> 2. Review special inspections: <br /> The Building Department shall review all special inspectors and special inspection requirements found in IBC <br /> Chapter 17 and the WABO-SIRP Standards 1701. <br /> 3. Monitor special inspections: <br /> Work requiring special inspections, and the performance of special inspectors, may be monitored by the <br /> Building Department's inspector.The jurisdiction's approval must be obtained prior to placement of concrete <br /> or other similar activities in addition to that of the special inspector. <br /> 4. Perform inspections as required by the local building code. <br /> 5. Issue Certificate of Occupancy: <br /> The Building Department will only issue a Certificate of Occupancy after all special inspection reports and the <br /> final special inspection report, have been submitted and accepted. <br /> Building Official: Date: <br /> E©EGV t <br /> JUN 2 1 2024 <br /> Permit rv;ic s <br /> GENERAL INFORMATION: <br /> Page 8 of 8 <br /> •Obtain a building permit before starting construction. __ <br /> • This construction bulletin is intended to provide guidelines and a checklist of some special inspections that may be required per 2021 IBC. <br />