My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11020 20TH DR SE 2025-01-13
>
Address Records
>
20TH DR SE
>
11020
>
11020 20TH DR SE 2025-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 11:04:30 AM
Creation date
10/31/2024 2:40:52 PM
Metadata
Fields
Template:
Address Document
Street Name
20TH DR SE
Street Number
11020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-) <br /> i Ivo <br /> II I III RcEovE E <br /> RILEYGROUP MAY 0 a 2024 1)) <br /> CITY OF EVERETT <br /> _ <br /> April 11, 2024 a s u Permit Services <br /> Ryan Rupert <br /> 3Stripe Management(Client) JUL 2 6 2024 <br /> 11217 19th Avenue Southeast — <br /> Everett,Washington 98208 CITY OF EVERETT <br /> Permit Services <br /> Subject: Silver Lake Townhomes-Updated Underpinning Recommendations <br /> 11020 20th Drive Southeast <br /> Everett,Washington <br /> RGI Project No.2013-302-4 <br /> Dear Ryan Rupert: <br /> As requested, The Riley Group, Inc. (RGI) is providing this letter summarizing our observations and <br /> recommendations regarding the settlement occurring at the above address.These recommendations are <br /> amended from our letter dated December 27th,2023 after discussions with you(the client)and structural <br /> engineers B2 Engineers. <br /> Surface Conditions <br /> It is our understanding from our discussions with RDH that a repair was made to the area with spall rock <br /> in 2020. Spall rock was encountered during a limited excavation in the center of the depression. Depth <br /> and edge conditions of the repair are unknown to RGI.Several cavities at the surface immediately adjacent <br /> to the structure have noticeably grown in size since our last visit. No cracking in exterior foundations was <br /> observed at the time of the exploration. Due to cavities forming at the southwestern corner of the <br /> structure,the foundation is undermined and not adequately supported on bearing soil. <br /> Subsurface Exploration <br /> On December 6, 2023, an RGI representative observed the advancement of 4 borings in and around the <br /> observed settlement area southwest of the structure at 11020 20t"Drive Southeast in Everett Washington. <br /> The approximate location of the borings and our previous hand augers are shown on Figure 1. <br /> RGI was previously on-site on October 20th to evaluate yard subsidence and provided a letter dated <br /> October 25, 2023 regarding recommendations for sidewalk and settlement repair, including additional <br /> recommended drilling for underpinning evaluation. The additional drilling was to determine the <br /> approximate depth of soils suitable for foundation support. <br /> The borings encountered approximately 5 to 10 feet of loose to medium dense silty sand with some gravel <br /> over dense to very dense glacial till. <br /> Underpinning Recommendations <br /> We recommend the structure be underpinned with 2-inch diameter steel pin piles to mitigate for the <br /> settlement and voids under exterior foundations observed during our site visits. Pin piles can be designed <br /> for an allowable capacity of 4-6 kips for 90 and 400 pound hammers,respectively.The allowable capacities <br /> apply to dead loads plus design live load conditions. For short-term loads,such as wind and seismic, a 1/3 <br /> increase in this allowable capacity may be used. <br /> Corporate office:17522 Bothell Way Northeast,Bothell,WA 98011 <br /> Tacoma Office:708 Broadway Suite#1008 Tacoma,WA 98402 <br /> Phone 425.415.0551•Fax 425.415.0311 <br /> www.riley-group.com 1 <br /> 1 1114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.