My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3301 SEAWAY BLVD TERRA POWER 2025-01-13
>
Address Records
>
SEAWAY BLVD
>
3301
>
TERRA POWER
>
3301 SEAWAY BLVD TERRA POWER 2025-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 8:19:19 AM
Creation date
10/31/2024 2:50:47 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
3301
Tenant Name
TERRA POWER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2405-012 Description: CONSTRUCT NEW INDOOR TEST PIT IN EXISTING BLDG <br /> Applied:5/7/2024 Approved: 5/24/2024 Site Address: 3301 SEAWAY BLVD <br /> Issued:5/28/2024 Finaled: City,State Zip Code: EVERETT,WA 98203 <br /> Status: PERMIT ISSUED-PAPER Applicant: BRENDAN BAKEY <br /> Parent Permit: Owner:SEAWAY WEST LLC <br /> Parent Project: Contractor:TIGER CONSTRUCTION LTD <br /> Details: <br /> **8-19-2024 REVISIONS AFTER ISSUANCE APPROVED,W/ADDITIONAL FIRE FEE** <br /> ENGINEERING FOR PIT AND FOOTTINGS PROVIDED TO SUPPORT EQUIPMENT LOADS.ALL WORK IS INTERIOR. NO CHANGE OT USE, <br /> OCCUPANCY,OR ENVELOPE PROPOSED. NO CHANGE TO EXISTING LOAD BEARING STRUCTURAL ELEMENTS PROPOSED,ONLY SLAB- <br /> ON-GRADE DEMO TO SUPPORT NEW PIT AND MAT FOOTINGS. <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/25/2024 6/25/2024 BLDG 01- RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> CONSULTATION <br /> Notes: <br /> 6/21/2024 3:47 PM TIGER CONSTRUCTION LTD <br /> Contact Name:TIGER CONSTRUCTION LTD <br /> Site Address:3301 SEAWAY BLVD <br /> Phone:3603062928 <br /> e-Mail:Todd@tigerconstruction.us <br /> Phone conversion with the contractor.Discussed revisions to the drawings.Submit revised drawings and supplement documents.Also discussed <br /> inspection process and special inspections. <br /> 7/2/2024 7/2/2024 BLDG 02 7RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> FOOTING/SETBACK APPROVAL <br /> Notes: <br /> 6/27/2024 8:58 AM TIGER CONSTRUCTION LTD <br /> slab rebar and vertical rebar stubs,vapor barrier <br /> Contact Name:TIGER CONSTRUCTION LTD <br /> Site Address:3301 SEAWAY BLVD <br /> Phone:3603062928 <br /> e-Mail:Todd@tigerconstruction.us <br /> 12"mat foundation.East side of pit.Upload special inspection reports <br /> I <br /> Printed:Thursday,29 August,2024 1 of 2 <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.