My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4828 DELAWARE AVE 2024-11-01
>
Address Records
>
DELAWARE AVE
>
4828
>
4828 DELAWARE AVE 2024-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 2:05:28 PM
Creation date
11/1/2024 2:04:25 PM
Metadata
Fields
Template:
Address Document
Street Name
DELAWARE AVE
Street Number
4828
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cf2dolo <br /> CITY OF EVERETT <br /> EVERETT Community, Planning & Economic Development Department <br /> WASHINGTON Planning Division <br /> ACCESSORY DWELLING UNIT CHECKLIST <br /> INSTRUCTIONS 3 Submit this checklist with either your building permit application (Review <br /> Process I), or with your Accessory Dwelling Unit (Review Process II) application, in order to apply <br /> for an attached or detached ADU. The proposal must meet Everett Municipal Code 19.08.100, <br /> Accessory Dwelling Units and any other applicable zoning regulations. Note: This checklist only <br /> addresses zoning code regulations for ADUs and does not address building code or other site <br /> development codes. <br /> Column to be completed by <br /> / Applicant 4, <br /> 1) ® Fees. See current Fee Schedule for Review Process I or II. Total Fee: <br /> This fee does not include building permit fees or system 1Q 01 <br /> development fees. Please speak with a Permit Technician at 425257- <br /> 8810 opt 8 to understand all fees involved to add an ADU to your <br /> property. <br /> Zone of Property: 11 <br /> 2) I?(Where are ADUs Permitted? <br /> ft <br /> An ADU shall be permitted as an accessory use to the principal Historic Overlay: N.)f " <br /> dwelling unit in the zones indicated in EMC 19.05, Use Table #5-1 on <br /> any legally established lot. <br /> CheckdReview <br /> one: <br /> 3) a Is your application a Review Process I or II? Process I. Complete this <br /> checklist and include it with your <br /> Review Process I. An ADU will be processed with your building permit building permit submittal. <br /> application if no modification of the design standards is requested. <br /> Review Process II. If requesting a modification from the design <br /> standards listed below,the application shall be processed as a <br /> Review Process II. (See #13) <br /> ❑ Single-family:more than one entrance on any street side <br /> 2930 Wetmore Ave, Ste 8-A '\ 425.257.8731 planning@everettwa.gov Everett, WA <br /> 98201 425.257.8742 fax everettwa.gov <br /> Updated April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.