My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4828 DELAWARE AVE 2024-11-01
>
Address Records
>
DELAWARE AVE
>
4828
>
4828 DELAWARE AVE 2024-11-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 2:05:28 PM
Creation date
11/1/2024 2:04:25 PM
Metadata
Fields
Template:
Address Document
Street Name
DELAWARE AVE
Street Number
4828
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1/14 <br /> Design Build Services, Inc. <br /> Engineering & Construction Management <br /> 213119 • 120th St.S.I-., Monroe,WA 98272 Phone:(360)793-9659 <br /> E-mail: nceideOcibsmonroe.corn <br /> November 23, 2022 <br /> Ryan Hammer <br /> 3200 Cedar St, 2nd Floor, <br /> Everett, WA 98201 <br /> (425) 257-8810 <br /> Subject. Comment Response Letter for Building Permit# B2210-031 at 4828 Delaware Ave. <br /> The following are responses to structural comments: <br /> 5. The retaining wall detail provided in the calculation package appears to not be applicable to <br /> the stair system. Please provide a revised detail with structural calculations for the retaining <br /> wall. The window well retaining wall details should also be provided. <br /> Response: The provided basement wall detail notes that the wall is able to free span 15' <br /> horizontal between supports. The staircase width is 14'8"total and the walls will be supported <br /> by the concrete stairway as well as the end wall. Basement wall calculations are provided. A <br /> premanufactured corrugated metal window well is being used;a detail is provided on sheet 2 <br /> of the drawings package. <br /> 6. The construction of the new concrete stairwell does not appear to provide construction <br /> details. Structural drawings should be submitted as needed that include framing plans, <br /> sections, details, construction schedules, fastening schedules, materials requirements, general <br /> notes, special inspection requirements, etc. The drawings should substantiate compliance <br /> with the prescriptive requirements of the IRC. See IRC Sections R106.1.1 and R301.1. <br /> Response. The stair is slab on grade therefore it is nonstructural, rebar amount and location <br /> has been added to the stair detail, compacted structural backfill is called out below the stair. <br /> Structural notes and details sheet is added to the drawings package. There are no structural <br /> changes made to the building other than the addition of a 4'x4'window in bedroom#2 for <br /> which the header was calculated in the original engineering and is now called out on the <br /> plans. The post and beam lines supporting the upper floor are to remain, interior framing <br /> works around it this has been noted on stamped plans. <br /> If you have any further questions or I can be of any further assistance, please call me at the above <br /> number <br /> c RDp D ECEIVE <br /> .,� DEC 0 1 2022 <br /> c <br /> • <br /> • <br /> CITY OF EVERETT <br /> • '34 Permit Services <br /> ' *S ANAL ENG\� <br /> 11/23/22 <br /> Ric Heide, P.E <br /> President <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.