Laserfiche WebLink
Project Name <br /> May 1, 2023 <br /> Page 4 <br /> included in the construction drawings; calculations should be submitted for review. See IBC <br /> sections 1015.6 and 1604.1. <br /> Response: See revised sheet A2.3, fall protection anchors added to roof plan. <br /> Response: See Structural Plan Review Response Letter, <br /> 17. Comment: The construction drawings should specify that the parking includes a minimum vehicle EV <br /> infrastructure of 10% charging spaces and 10% future spaces per IBC section 429.4 Items 1 and 2, <br /> respectively. See IBC section 429.2. <br /> Response: See revised sheet A0.2, added electric vehicle charger stalls to zoning code <br /> summary. <br /> Response: See Revise sheet A1.2, added dual EV charger station to enlarged site plan. <br /> 18. Comment: Continuing with the previous comment, EV infrastructure is required to be provided for the <br /> accessible spaces per IBC section 429.5. <br /> Response: See Revised sheet A1.2, added hold for future dual EV charger station to <br /> enlarged site plan. <br /> 19. Comment: 04/07/2023 email comments. I missed a code requirement that should be incorporated <br /> into the new building design. WSEC section C411 requires new buildings to have a solar readiness <br /> zone. <br /> Response: See revised sheetA2,3, added solar readiness area to plan. <br /> Structural <br /> 1. Comment: The construction drawings should include a section with the following note and listing work <br /> to be reviewed and approved by the EOR prior to construction. Review and approval by the EOR will <br /> be deemed to satisfy the requirements of IBC sections 107.3 and 107.3.4.1. This work will not require <br /> additional review by the City of Everett as it has been reviewed in principle on the issued construction <br /> drawing; final review responsibility is deferred to the EOR. Alternatively, the applicant is required to <br /> identify and submit the items listed below under separate permit applications for review and approval <br /> prior to construction, or they must be included in the current submittal documents. Work qualifying as <br /> shop drawings may be listed separately per the Exception of IBC section 107.1. <br /> Response: See Structural Plan Review Response Letter <br /> 'Submittal documents for the following components and systems are required to be reviewed and <br /> approved by the Engineer-of-Record(EOR)in accordance with IBC section 107.3. The submittals shall <br /> be prepared by a professional engineer(s) licensed in the state of Washington. The EOR shall perform <br /> a comprehensive review for conformance with the approved construction drawings and the referenced <br /> buildings codes. The EOR shall mark the submittals as approved for construction prior to fabrication <br /> and erection by the manufacturer(s)and contractor(s)." <br /> Response: See Structural Plan Review Response Letter <br /> Based on a review of the drawings, work to be listed should include but is not limited to: <br /> b. Engineered roof trusses. <br /> c. Elevator system. <br /> 2. Comment: Structural and geotechnical special inspections are required for this project. A table of the <br /> required inspections is provided in the"Quality Assurance" section of the General Structural Notes on <br /> sheet S000. The table should be revised to specify the types and extent of each inspection (e.g., <br /> continuous, periodic). See IBC sections 107.1 and 1704.3.1. <br /> Cc: 4d y/7Z <br />