Laserfiche WebLink
Project Name <br /> May 1, 2023 <br /> Page 6 <br /> b. Calculations substantiating the capacities of the mudsill anchors should be submitted for review. It <br /> is presumed that the anchors will be substantiated by an ICC testing report or other approved <br /> testing agency. See IBC sections 104.11 and 1604.1. <br /> Response: See Structural Plan Review Response Letter <br /> 10. Comment: The shear wall on Grid 10 does not have a direct connection to the diaphragm. A collector <br /> designed per ASCE 7-16 section 12.3.3.4 appears required to provide a load path. Additional <br /> calculations substantiating the design should be submitted for review. Additional framing and details <br /> should be included as needed. See IBC sections 1603.1, 1604.1,1604.2, and 1604.4. <br /> Response: See Structural Plan Review Response Letter <br /> 11. Comment: The building includes re-entrant corners at Grids C/8.4 and F2/5, constituting a Type 2 <br /> Horizontal Irregularity per ASCE 7-16 Table 12.3-1. The diaphragm chords should be developed into <br /> the diaphragms. The development length should be sufficient for the diaphragms to resist chord <br /> forces in addition to the diaphragm shear forces. The chord forces should be increased 25% per <br /> section 12.3.3.4. See IBC sections 1613.1 and 2306.1, and AWC SDPWS-15 section 4.1.4. <br /> Response: See Structural Plan Review Response Letter <br /> 12. Comment: The shear wall holdown design has not been provided in the structural calculations. The <br /> earthquake component of the uplift forces exceeds 20% of the total uplift (i.e., the earthquake force is <br /> 100% of uplift force). The earthquake component shall be increased per the provisions of ACI 318-14 <br /> section 17.2.3.4.3. Calculations substantiating the holdown design should be submitted for review. <br /> The design load shall be determined per ASCE 7-10 section 12.4.3.2 Equation 7 including the vertical <br /> seismic load effect per section 12.4.2.2. The seismic holdown forces shall be calculated even when <br /> wind controls the lateral design. See IBC sections 1604.10, 1613.1, and 1901.2. <br /> Miscellaneous: <br /> 13. Comment: The following comments should be addressed for the elevator system: <br /> a. The elevator design drawings should be included in the list of deferred on sheet S1.0C. See IBC <br /> section 107.3.4.1. <br /> b. The design loads for the elevator system, including impact loading, should be specified in the <br /> "Design Loads" section on sheet S1.0C. When actual design loads are not available, estimated <br /> design loads should be specified for the design, and verified when the elevator design drawings <br /> are submitted for review. See IBC sections 1603.1.8 and 1607.9.1. <br /> c. The building structure (i.e., elevator shaft and supporting floor framing) that supports components <br /> of the elevator system is included in the current submittal drawings. Calculations substantiating <br /> the design of the structure to support the elevator loads concurrently with other loads should be <br /> submitted for review. The calculations should include the evaluation of deflection limits per IBC <br /> section 1607.9.1. The design shall consider concurrent multi-directional loading as determined by <br /> the elevator manufacturer. See IBC sections 1604.2 and 1605. <br /> d. The connections between the elevator guide rails and the structural framing are typically the <br /> responsibility of the engineer-of-record for the building system. At a minimum, connection details <br /> between the rail bracket and structural framing are required. Calculations and details for the <br /> elevator connections to the structural framing should be submitted for review. The design shall <br /> consider concurrent multi-directional loading as determined by the elevator manufacturer. The <br /> required locations and maximum spacing for the connection points should be specified in the <br /> structural drawings. See IBC section 107.2.1 and 1604.4. <br /> Response: See Structural Plan Review Response Letter <br /> Cc: 4d <br />