My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8531 EVERGREEN WAY 2025-03-04
>
Address Records
>
EVERGREEN WAY
>
8531
>
8531 EVERGREEN WAY 2025-03-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 9:21:56 AM
Creation date
11/1/2024 2:27:44 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8531
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022 System Development Fee Calculations <br /> Permit#: PW2302-011 Additional Notes: <br /> Project Address: 8531 EVERGREEN WAY <br /> Project Name: SITE WORK FOR CHC <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: _Everett Prepared By: Thad Newport Date: 8/22/2023 <br /> Outside City Limits? _No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: <br /> Fee Calculations: <br /> Water&Sewer System Development Fees: <br /> Domestic Meter: Fee Calculation(Before Credit): Credit Calculations(Up to 3 meters for Meter-Based Calculation or 3 previous building uses for Administrative Guidelines-Based Calculation): <br /> *subject to Administrative Guidelines Proposed Building Use: Office Previous Bldg Use#1: Vacant/Undeveloped Previous Bldg Use#2: No Other Use Previous Bldg Use#3: No Other Use <br /> ProposedUnit Measure: 8,700 Sq.Ft. Unit Measure for Use#1: - Sq.Ft. Unit Measure for Use#2: - None Unit Measure for Use#3: None <br /> Note:Meter Size Used for Proposed Meter Size: 1" Credited Meter#1 Size: 3/4" Credited Meter#2 Size: None Credited Meter#3 Size: None <br /> Calculation Water Fee: $7,200.00 Water Credit#1: $4,311.00 Water Credit#2: $0.00 Water Credit#3: $0.00 <br /> Sewer Fee: $9,318.00 Sewer Credit#1: $5,580.00 Sewer Credit#2: $0.00 Sewer Credit#3: $0.00 <br /> Total Fees Due:Add to Utility Permit for Domestic Meter <br /> Permit#:U Water Sys Dev Fee Total: $2,889.00 This fee reflects credit for existing water meter <br /> Sewer Sys Dev Fee Total: $3,738.00 This fee reflects credit for existing water meter <br /> Total: $6,627.00 <br /> Irrigation Meter: Fee Calculation(Before Credit): Credit Calculations: <br /> Proposed Meter Size: None Credited Meter Size: None <br /> Water Fee: $0.00 Water Credit: $0.00 <br /> No Sewer Fee: $0.00 No Sewer Credit: $0.00 <br /> Total Fees Due:Add to Utility Permit for Irrigation Meter <br /> Per mlt#:U Water Sys Dev Fee Total: $0.00 This fee reflects credit for existing water meter <br /> No Sewer Sys Dev Fee: $0.00 Irrigation meters are only subject to the water portion of system development fees <br /> Total: $0.00 <br /> Fire Meter: Proposed Meter Size: 3/4" For informational purposes only <br /> Permit#:U No Sys Dev Fees: $0.00 Fire meters are not subject to system development fees <br /> Stormwater System Development Fees: <br /> Permit#: BXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit <br /> Permit#: PW2302-011 Type of Construction: New Construction/Redevelopment <br /> Square Feet of New Plus Replaced Hard Surfaces: 9,908 SF <br /> Stormwater System Dev Fee: $2,661.86 Add this fee to the Public Works Permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.