Laserfiche WebLink
<br />Other than Normal <br />Working Hours Includes the hours of 4:01 p.m. to 6:59 a.m., Monday to Friday and <br />all day Saturday, Sunday, and City Holidays. <br />Proposal Criteria Figure The amount determined in the Proposal Criteria Figure Calculation <br />section of the Price Proposal, which is used for the purposes of <br />determining the lowest price. <br />Prepriced Task A task described in and for which a unit price is set forth in the <br />Construction Task Catalog®. <br />Request for Proposal A written request to the Contractor to prepare a Proposal for the <br />Detailed Scope of Work referenced therein. Note: For clarity, the <br />Request for Proposal issued by the City for the selection of the <br />Contractor is referred to as the “RFP”. <br />Supplemental Job Order A secondary Job Order (change order) developed after the initial Job <br />Order has been issued for the purpose of changing, deleting, or <br />adding work to the initial Detailed Scope of Work, or changing the Job <br />Order Completion Time. <br />Technical Specifications The written requirements for materials, equipment, systems, <br />standards and workmanship for the Work, and performance of <br />related services. <br />1.2 Definitions/Abbreviations <br />AAR Association of American Railroads <br />ACI American Concrete Institute <br />AISC American Institute of Steel Construction <br />ANSI American National Standards Institute APA American Plywood Association <br />API American Petroleum Institute <br />ARA American Railway Association <br />AREA American Railway Engineering Association ASCE American Society of Civil Engineers <br />ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers <br />ASME American Society of Mechanical Engineers <br />ASTM American Society for Testing and Materials AWS American Welding Society