My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction 10/30/2024
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Granite Construction 10/30/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2024 2:44:09 PM
Creation date
11/1/2024 2:43:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction
Approval Date
10/30/2024
End Date
12/31/2025
Department
Public Works
Department Project Manager
Paul Wilhelm
Subject / Project Title
Access to Evercam web camera service
Tracking Number
0004571
Total Compensation
$5,055.40
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />PROFESSIONAL SERVICES AGREEMENT <br />This Professional Services Agreement (“Agreement”) is effective as of the date of last <br />signature below and is between the City of Everett, a Washington municipal corporation (the <br />“City”), and the Service Provider identified in the Basic Provisions below (“Service Provider”). This <br />Agreement is for the purpose of the Service Provider providing services as set forth in this <br />Agreement. This Agreement includes the Basic Provisions, the attached General Provisions, and <br />the scope of work attachment, if any, referenced in the Basic Provisions. <br />BASIC PROVISIONS <br />Service Provider <br />Granite Construction, Inc. <br />1525 East Marine View Drive <br />Everett, WA 98201 <br />ryan.olson@gcinc.com <br />City Project <br />Manager <br />Paul Wilhelm <br />City of Everett – Public Works <br />3200 Cedar Street <br />Everett, WA 98201 <br />pwilhelm@everettwa.gov <br />Scope of Work <br />(must select one) <br />☐Scope of Work is attached. One sentence summary of scope of work is as <br />follows Enter text <br />☒Scope of Work is not attached. Instead, the Scope of Work is as follows: Provide the City access to Granite's Evercam web portal to obtain footage from Granite's installed fixed position web camera at the Edgewater Bridge Replacement project site that is monitoring construction for duration of the project. The City may permanently use and own the footage that the City downloads from the web portal.”
The URL can be used to link to this page
Your browser does not support the video tag.