Laserfiche WebLink
6. The purpose of the drag truss on Grid 3 should be clarified. This truss does not appear to <br /> connect to any vertical elements. <br /> 7. Deferred Submittal Note 1 on Sheet SN1 should be revised to require the FOR to perform a <br /> comprehensive review of the documents. This is in lieu of submitting these items to the CoE for <br /> additional permits. Alternatively, these items will require additional permits prior to construction. <br /> Additional Documents included: <br /> • Drive Thru Canopy Shop drawings—reviewed and stamped. <br /> • Drive Thru Headache Bar Shop drawings—Reviewed and Stamped. <br /> • Drive Thru Canopy Shop Calcs—reviewed and stamped. <br /> • Drive Thru Headache Calcs—Reviewed and Stamped. <br /> Feel free to contact me if you have any additional questions or need further clarification on any responses <br /> to the corrections or corrections in the drawings. <br /> Respectfully, <br /> Pedro McCracken Design Group, Inc. <br /> Ariane Sanders <br /> Project Manager <br /> PM DESIGN GROUP, INC Page 2 of 2 <br />