Laserfiche WebLink
ANCHOR ROD SUBSTITUTION SCHEDULE <br /> c <br /> SIMPSON ROD SQ.EMBED. \ DBL.HEAVY HEX NUTS RE p <br /> - 'PAB'l2 DIA. WASHER SIZE 3 L <br /> STD.WASHER U.N.O. <br /> PAB4(H)-Xx Y" IV 50. x% IA. s <br /> PABS(H)-XX 3'e I("SQ.xyz IV <br /> `° <br /> PAB6(H)-Xx 3/,• 2k,•SQ.,Yz IY' <br /> 12_I O° STD.WASHER U.N.O. <br /> XI- TPAB7(H)-XX '/e 2)',5Q.xY' IV <br /> A - 2'-�' / "—�Ix 4'- 4'-SY" I D' PABB(H)-XX I' 3'SQ. x�9 1�/e HEAW HEX LEVELING NUT ,y <br /> PAB9(H)-XX lye 3�•SQ.x�� 2• REVERENCE u\ \ I \ <br /> ID CY- PABIO(H)-XX 14" 3z"5Q.x4" 24 cs <br /> NOTES: ' <br /> ENGINEERING <br /> 11 <br /> I. WHERE SPECIFIED AS HIGH STRENGTH `n <br /> 0 ® RIPH"),USE w/ GR. 105;OTHERWISE, °L J i HEAVY HEX NUT www.reverenceengmeering.com m <br /> USE GR.36 MIN. Q_ EMBED.WASHER (6 19) 354-1152 <br /> 2."XX"15 THE TOTAL ROD LENGTH. BY MFR.OR PER -0 <br /> 3.WASHER SIZES ARE MINIMUMS. -JIr" SUB.SCHED. 600 B STREET, STE 300 O <br /> 4.WASHERS AND BASE PLATES TO HAVE \ \ 'it HEAW HEX NUT SAN DIEGO, CA 92 I 0 I 2 <br /> STD.HOLES. <br /> XI 131 <br /> • O D,, =D +Xs' PREPARED FOR: O <br /> \ — - xr"cn Y? <br /> ALUM.RECT.TUBE 0 0 SIGNTECII ELECTRICAL t <br /> CROSSIMEMBER ADVERTISING, INC. <br /> — I BTM.FLUSH(TYP.) ALUM.RECT.TUBE <br /> ui �2uSx I/8' trl <br /> v <br /> • \ (PERIMETER) <br /> s 44 <br /> ALUM.RECT.TUBE • <br /> 3 x 5 x I/4' ALUM.RECT.TUBE <br /> " O \—ALUM.RECT.TUBE 3 x 2 x I/8' u <br /> ALUM.RECT.TUBE <br /> 2x8x I/8' <br /> 4x 2 x I/5" Z � Z <br /> — <br /> (PERIMETER) T 0 <br /> II.J -0 <br /> w z � � oN <br /> t0 I/8"ALUM.CLADDING U Z 0, >+ <br /> 9 <br /> BY FAB.) V <br /> \ `I. — W Octnn <br /> Q = `� � <br /> u—J z [Vinw ri <br /> O CANOPY FRAMING PLAN ri <br /> Q U - w <br /> o <br /> z u <br /> U <br /> / 13'-6" / ri u v <br /> a 2 s <br /> 3 <br /> I'-2% / 1'-4"' ye—I'-4"— -/-1'-23/a J• PROJECT#: °I <br /> APPROACH COLUMN 1,-°. 2 3 0 9 1 2 9 E <br /> \ d ° ° ° °4 ° a Yz" Yz' No: Issue/Revision: ° <br /> - ° a ° ° $ J <br /> ---- into'Submittal I0-02-2023 j\ ° ° °d ° d° ° ° ° <br /> d °❑ ° d ° `° ° a Gd °a ° " —� n• _3/16 V 7,; <br /> ° O ❑ ° <br /> ° ° d ` ° n TUBE PER ELEV i° 4 ° - <br /> 0 <br /> N a L <br /> ° ° e ° a d d <br /> Yz' Yz' F.'? ° ° d a ° ° ° ° ° °d ° a ° 9 <br /> el d -n <br /> Q O O a s ° 'ad 0 0 ° a ° ° ° ° d°° °d °° ° a 0 < d ° M �� A N <br /> • — i�/� TUBE PER ELEV. a ° a ° < d a ° °° ° ° ° °° ° ° ° d 4 ° ° ° ° ° ° ° 0 , <br /> 4° ° ° / Al T <br /> CO " 3/ 6 r ° d e < ° ° ° d ° a ° ° ° 5/8"STEEL PL. I���OF F�,� t <br /> 41110 s/e'STEEL PL. d ° d ° a d° ° d a \ `i�`y O' o <br /> < °`' Z <br /> CLADDING ABOVE DEPARTURE COLUMN <br /> TUBE PER ELEV. (BY FAB.) BASE PL. tiff .• �I 4-- _ / <br /> ..i TUBE PER ELEV. - _ 4' '6 <br /> i ,� 3"DEEP CONC.WELL 2'DEEP CONC.WELL • • 46 ... <br /> 5 <br /> ;:: 3/1 6 2'CLR.FROM PL. 2'CLR.FROM PL. ` • <br /> O <br /> CLADDING ABOVE 3/16 r , , . E �C 0) <br /> V O O (BY FAB.) O O I A - `- y <br /> HH ° <br /> T <br /> CANOPY ABOVE ENGINEER: <br /> BJS °14 <br /> APPROACH PLATE DETAIL DEPARTURE PLATE DETAIL DWG TITLE: T <br /> STRUCTURAL <br /> y7, <br /> SHEET- SIZE: _g <br /> O <br /> 2 FOUNDATION PLAN 5 .4 E.) n <br /> "6 <br /> The designs,details and specifications contained in this drawing are confidential.The recipients of this drawing hereby acknowledge and agree that it 15 the sole property of Reverence Engineering and that they shall neither use nor reveal any of the designs,details and specifications contained in this drawing,outside of the contractual agreement expressed written permission from <br /> Reverence Engineering.Deviations from this drawing shall not be made without consulting Reverence Engineering. In case of incongruities between drawings,specifications,and details included in contract documents.Reverence Engineering shall decide which indication must Inc followed and their decision shall be final.Copyright Reverence Engineering.All rights reserved. ��1 <br />