Laserfiche WebLink
Page 50 of 123 <br /> <br />Day Unless otherwise designated in the Contract Documents, a calendar <br />day of twenty-four (24) hours measured from midnight to the next <br />midnight. <br />Defective An adjective which when modifying the word Work refers to <br />Work that is unsatisfactory, faulty or deficient, or does not conform <br />to the Contract Documents or does not meet the requirements of <br />any inspection, test or approval referred to in the Contract <br />Documents, or has been damaged prior to Project Manager's <br />recommendation of final payment. <br />Drawings The drawings which show the character and scope of the Work to be <br />performed and which have been prepared or approved by Project <br />Manager assigned to the Job order and which are referred to in the <br />Detailed Scope of Work. <br /> <br />Effective Date of the <br />Contract <br /> <br /> <br />Federally Funded Job <br />Order <br /> <br />Federal Contract Clauses <br />The date indicated in the Contract on which it becomes effective, <br />but if no such date is indicated, it means the date on which the <br />Contract is signed and delivered by the last of the two parties to <br />sign and deliver. <br /> <br />A Job Order designated by the City as federally funded, in which <br />case the Job Order includes the Federal Contract Clauses. <br /> <br />The current federal contract clauses determined by the City to be <br />applicable to a Federally Funded Job Order. .