Laserfiche WebLink
<br />1 <br /> <br /> <br />CONTRACT (EMERGENCY) <br /> <br />THIS CONTRACT is dated and effective as of the date of last signature below and is by and <br />between the City of Everett, a Washington municipal corporation (the “City”), and the Contractor <br />shown below in the Basic Provisions. This Contract is made pursuant to an emergency under RCW <br />39.04.280. <br /> <br />1. Basic Provisions: <br />Emergency <br />Declaration <br />Information <br />Issuer of Declaration: Mayor <br />Date of Declaration: October 25, 2025 <br />Brief Description of <br />Emergency Work <br />Repair of Screw Pump Upper Bearing located at the Water Pollution Control <br />Facility. <br />Contractor <br />Pellco Construction, Inc. <br />13036 Beverly Park Road <br />Mukilteo, WA 98275 <br />mikep@pellcoconstruction.com <br />City Project <br />Manager <br />Matt Gagner <br />City of Everett – Public Works <br />4027 4th ST SE <br />Everett, WA 98201 <br />mgagner@everettwa.gov <br />Contract Time The Work shall be physically complete in all respects within 15 calendar days <br />from the date of issuance of the Notice to Proceed. <br />Contract Price $27,343.12 <br />Contractor <br />Insurance <br />Contact <br />Information <br />Jarrod Cordle <br />425-489-2116 <br />Jarrod.cordle@hubinternational.com