My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2707 COLBY AVE BASE FILE 2025-01-09
>
Address Records
>
COLBY AVE
>
2707
>
BASE FILE
>
2707 COLBY AVE BASE FILE 2025-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 1:15:55 PM
Creation date
11/7/2024 9:35:08 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2707
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> BLDG 09-FIRE CORRECTION <br /> 4/26/2022 4/26/2022 STOPPING/BLOCKIN KURT KECK REQUIRED Finish lid NE corner in hallway <br /> G <br /> Notes: <br /> 4/25/2022 11:19 AM Craig Sanderson <br /> Fire rated corridor 7 th floor <br /> Contact Name:Craig Sanderson <br /> Site Address:2707 COLBY AVE 7TH FL <br /> Phone:4255080413 <br /> e-Mail:craig.sanderson@skotdal.com <br /> 4/26/2022 4/26/2022 BLDG 13-CEILING <br /> GRID KURT KECK NOT READY Complete electrical inspections <br /> Notes: <br /> 4/22/2022 11:19 AM Craig Sanderson <br /> Contact Name:Craig Sanderson <br /> Site Address:2707 COLBY AVE 7TH FL <br /> Phone:4255080413 <br /> e-Mail:craig.sanderson@skotdal.com <br /> (4/25/2022 3:24 PM KMK) <br /> rescheduled to coincide with electrical inspections <br /> 4/29/2022 4/29/2022 BLDG 16-FINAL KURT KECK NOT READY see notes <br /> Notes: <br /> 4/28/2022 7:45 AM Craig Sanderson <br /> PM inspection please <br /> Contact Name:Craig Sanderson <br /> Site Address:2707 COLBY AVE 7TH FL <br /> Phone:4255080413 <br /> e-Mail:craig.sanderson@skotdal.com <br /> (4/29/2022 10:33 AM KMK) <br /> Complete all electrical inspections. <br /> Note:there are some heaters in the grid that have been inspected for mechanical but need a separate electrical permit.Obtain this permit and <br /> inspections. <br /> Reschedule for building final when ready. <br /> 5/4/2022 5/4/2022 BLDG 16-FINAL KURT KECK NOT READY complete electrical finals <br /> Notes: <br /> 5/3/2022 9:01 AM Craig Sanderson <br /> Contact Name:Craig Sanderson <br /> Site Address:2707 COLBY AVE 7TH FL <br /> Phone:4255080413 <br /> e-Mail:craig.sanderson@skotdal.com <br /> I <br /> Printed:Tuesday,26 November, 2024 2 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.