My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8600 18TH AVE W HEAD START 2025-09-30
>
Address Records
>
18TH AVE W
>
8600
>
8600 18TH AVE W HEAD START 2025-09-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 1:55:49 PM
Creation date
11/7/2024 10:10:32 AM
Metadata
Fields
Template:
Address Document
Street Name
18TH AVE W
Street Number
8600
Unit
HEAD START
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ON09 PERMIT# <br /> BUILDING PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone 7771 <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> Bldg/TI/Addn/Rem Size Total No.of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu" Fee:Type: Amount$ <br /> Basement ❑No ❑Yes, Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 111/2022: <br /> Fire Sprinklers: ❑Update Existing ❑New System []Not Req'd Park Impact Fee Total (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing El New System El Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: ❑ 100%Credit-Issued 1/l/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ❑ No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ Additional Notes: <br /> I <br /> Approved By: Date: <br /> PUBLIC WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: I PW Worksheet Needed if: <br /> '[]Sys Dev Eval(util/SW)❑Traffic Mit Eval <br /> Approved By: Avy Date: )a ,2 'y! I❑Site Work/Drainage ❑Address Letter <br /> ❑Backflow Prevention for high hazard: <br /> i(dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT i <br /> isupportive housing) <br /> Separate/Deferred Submittals Required: El Route this folder for PW Review at end ---PW Review Worksheet <br /> []Fire Sprinklers []Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND []Create Green Folder []Submitted Previously ❑Deferred <br /> ❑ This Permit is Approved by Public Works <br /> Fire Dept. Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder Qoin with this folderfor permit Issuance) <br /> Approved By: Date: ❑ Will be issued separately(separate Green Folder,PW issued ahead of Bldg) <br /> ❑ Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.