My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
311 E MAGNOLIA AVE 2024-12-04
>
Address Records
>
E MAGNOLIA AVE
>
311
>
311 E MAGNOLIA AVE 2024-12-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2024 1:46:57 PM
Creation date
11/7/2024 1:31:25 PM
Metadata
Fields
Template:
Address Document
Street Name
E MAGNOLIA AVE
Street Number
311
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ ■ SUN SYSTEM BONDING & GROUNDING ' BLUE RAVEN <br /> Ono , FRAME <br /> S19 <br /> M <br /> M <br /> MICRORAILTM INSTALLATION GUIDE ; PAGE 1403 N.0remResearch UT84097 F Mvay <br /> 800.377.4480 <br /> --———————————————————————————————————————————————————————————————————————————————————————————— ——————————————————————————————— WWW.BLUERAVENSOLAR.COM <br /> ® CONFIDENTIAL-THE INFORMATION <br /> HEREIN CONTAINED SHALL NOT BE <br /> USED FOR THE BENEFIT OF ANYONE <br /> 0-0 <br /> EXCEPT BLUE RAVEN SOLAR NOR <br /> SHALL IT BE DISCLOSED IN WHOLE OR <br /> IN PART TO OTHERS OUTSIDE <br /> o RECIPIENTS ORGANIZATION,EXCEPT <br /> IN CONNECTION WITH THE SALE AND <br /> USE OF THE RESPECTIVE EQUIPMENT, <br /> WITHOUT THE WRITTEN PERMISSION <br /> o OF BLUE RAVEN SOLAR LLC. <br /> f' <br /> NABCEP <br /> CERTIFIED <br /> PV INSTALLATION <br /> PROFESSIONAL <br /> Scott Gurney <br /> #PV-011719-015866 <br /> E W BONDING PATH: CONTRACTOR: <br /> E-W module to module bonding is accomplished BRS FIELD OPS <br /> with 2 pre-installed bonding pins which engage 385-498-6700 <br /> on the secure side of the MicrorailTM and splice. <br /> I <br /> I <br /> Star Washer is WEEBLUG <br /> Single Use Only Single Use Only <br /> Alternate method <br /> N-S BONDING PATH: <br /> TERMNALTORQUE, N-S module to module bonding is <br /> Install Conductor and accomplished with bonding clamp with 2 integral <br /> torque to the following: TERMINALTORQUE, TERMNALTORQUE bonding pins. (refer also to alternate method) <br /> 4-6 AWG 35in-lbs Install Conductor and Install Conductor and <br /> 8 AWG 25 in-lbs torque to the following: torque to the following: <br /> 10-14 AWG 20 in-lbs 4-14 AWG 35in-lbs 6-14 AWG 7ft-lbs <br /> DRAWING BY: <br /> LUG DETAIL& TORQUE INFO LUG DETAIL& TORQUE INFO LUG DETAIL& TORQUE INFO <br /> Ilsco Lay-In Lug (UBLr4DBT) Ilsco Flange Lug (SGB-4) Wiley WEEBLug (6.7) PLOT DATE: <br /> • 10-32 mounting hardware 1/4" mounting hardware 0 1/4" mounting hardware <br /> • Torque = 5 ft-lb 0 Torque = 75 in-lb 0 Torque = 10 ft-lb Alternate method <br /> • AWG 4-14-Solid or Stranded AWG 4-14-Solid or Stranded AWG 6-14-Solid or Stranded PROJECT NUMBER: <br /> TRIMRAIL BONDING PATH: <br /> NOTE: ISOLATE COPPER FROM ALUMINLA4CONTACTTO PREVENT CORROSION Trimrail to module bonding is accomplished with SHEET NAME: <br /> System bonding is accomplished through modules. System grounding accomplished b attaching bonding clamp with integral bonding pin and <br /> y g p g y g g p y g SPEC SHEET <br /> a ground lug to any module at a location on the module specified by the module manufacturer. bonding T-bolt. (refer also to alternate method) REVISION: PAGE NUMBER <br /> ---- SS <br />
The URL can be used to link to this page
Your browser does not support the video tag.