My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W 2025-01-13
>
Address Records
>
36TH AVE W
>
5900
>
5900 36TH AVE W 2025-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 1:10:20 PM
Creation date
11/12/2024 9:24:14 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOT E S T I Oak '.SZ' <br /> Bellingham I Arlington Oak Harbor <br /> wvvw.geotest-i nc.com <br /> An MMA Company <br /> Soil Observation Report <br /> PROJECT: Bridge Point Everett 500-Fastsigns TI JOB#: 24-1489 <br /> ADDRESS: 5900 36th Avenue West, Everett,WA REPORT#: S0001 <br /> PERMIT#: B2403-091 DATE: 6/25/2024 <br /> CLIENT: Bridge Industrial PAGE#: 1 of 2 <br /> CONTRACTOR: Northway Construction INSPECTOR: Suzie Miller <br /> OBSERVATION OF: Interior Footings Subgrade. <br /> GeoTest was onsite as requested to observe the footings subgrade at the above location. The <br /> weather was sunny and in the 60s. Upon GeoTest's arrival onsite, the footings had been cut <br /> into the previously existing slab on grade concrete floor. The subgrade was compacted with a <br /> jumping jack. GeoTest probed the subgrade with a 3/8" T-Probe under full body weight and <br /> achieved 1/4" to 3" of penetration. The subgrade appears to have been prepared in <br /> conformance with the requirements called for in the Geotechnical Engineering Report by Earth <br /> Solutions NW dated December 13, 2016. GeoTest informed the contractor of their findings. <br /> GeoTest will return, upon request to provide further observation. <br /> Image 1 - Compaction of <br /> footing subgrade with a <br /> jumping jack. <br /> i <br /> COPIES:bfox@rmacompanies.com,brian@northwayinc.com,jason@northwayino.com,smayes@bridgeindustrial.com 'r Reviewed by <br /> This report shall not be reproduced except in full,without the written approval of GeoTest Services,Inc. <br /> GeoTest's representatives are on-site to observe,test and provide recommendations. The Contractor retains sole responsibility for the methods, <br /> operations and sequences of construction,including obtaining approval from the design authority and owner prior to proceeding with any change in the work scope and/or any associated costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.