My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE SUMMIT EVERETT 2025-01-10
>
Address Records
>
GRAND AVE
>
2900
>
SUMMIT EVERETT
>
2900 GRAND AVE SUMMIT EVERETT 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 11:40:05 AM
Creation date
11/12/2024 11:29:13 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
SUMMIT EVERETT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 f <br /> 1. • <br /> • <br /> 2:12 <br /> Project name: WATERLINE GYM <br /> Permit#: B2306-070 <br /> Date: 8th April 2024 <br /> Response to Plan Examiner's Comments <br /> Date: 8th March, 2024 <br /> To: Scott Schreffler, RA <br /> Senior Architect, <br /> Everett Permit Services <br /> 3200 Cedar Street, 2nd Floor, <br /> Everett, WA 98201 <br /> Phone: (425) 257-8810 APR 1 0 2024 <br /> Email: SSchreffler@everettwa.gov CITY OF EVERETT <br /> Re: Waterline Gym Permit Services <br /> 2900 Grand Avenue - Spaces 4 and 5 <br /> Everett, Washington <br /> Permit #: B2306-070 <br /> Hello, <br /> I am writing a response letter per Scott Schreffler's comments of The Planning Division department dated <br /> 18th March, 2024. For the Waterline Gym project. <br /> We have relocated the metal stair between column lines 7 & 8 West of the bouldering Gym area, and <br /> the mezzanine was updated to reflect the relocation. See drawing Al upper floor plan, and the attached <br /> structural drawings. <br /> Architectural: <br /> Everett(Scott): <br /> 1. It appears that on sheet Al.... <br /> [2812 response] See drawing A1.1, occupancy plan, and drawing Al Site plan. The <br /> drawing has been updated to reflect the required exit paths without exiting through <br /> adjacent tenant spaces. Also, a separate wall and doors have been erected to divert the <br /> occupants directly to the exterior. <br /> Everett(Scott): <br /> 2. The bouldering room and fitness .... <br /> a. Panic and fire exist hardware .... <br /> [2812 response] the doors have been updated to reflect panic hardware. See door <br /> schedule on Drawing A3. <br /> 2812 Colby Avenue Everett WA 98201 <br /> P(425)252-2153 www.2812architecture.com <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.