Laserfiche WebLink
KEYED NOTES: d <br /> _ <br /> 1. ROOF MOUNTED EXHAUST OPENING.PROVIDE WITH WEATHER PROOF ROOF CAP.MAINTAIN A IMF <br /> 10'-0"FROM ANY OUTSIDE AIR INTAKE OPENING. <br /> 2. ROOF MOUNTED PACKAGED UNIT WITH MANUFACTURER'S ROOF CURB.COORDINATE LOCATION <br /> WITH STRUCTURAL BUILDING CONDITIONS,FURNISH AND INSTALL ALL TEMPERATURE CONTROL <br /> WIRING FROM THE UNIT TO THE THERMOSTAT OR OTHER CONTROL DEVICES,UNIT SHALL HAVE ALL <br /> FILTERS REPLACED AND ALL COILS CLEANED WITH APPROVED METHODS.ALL COIL FINNS SHALL BE <br /> COMBED AS STRAIGHT AS POSSIBLE.ALL THIS WORK SHALL BE PERFORMED AFTER CONSTRUCTION <br /> AND PRIOR TO C.O.SEE DETAIL 2/M0.1&10/M0.1 FOR MORE INFORMATION. <br /> 3. PROPOSED LOCATION FOR SPLIT SYSTEM REMOTE ROOF MOUNTED CONDENSER UNITS AND <br /> /_---_` D C REFRIGERATION SUPPORT SYSTEM. <br /> C 4. ROOF MOUNTED OUTSIDE AIR INTAKE.PROVIDE WITH WEATHER PROOF ROOF CAP,MAINTAIN A <br /> CONDENSING INSULATED REFRIGERANT LINES ABOVE \ MINIMUM 10'-0"FROM ANY EXHAUST OR PLUMBING VENT. Ln <br /> UNIT PLATFORM ROOF-PROVIDE WITH WEATHER-PROOF 5. REFRIGERATION LIQUID AND SUCTION LINES FROM ROOF MOUNTED CONDENSER UNITS,PENETRATE <br /> SEE STRUCTURAL ALUMIDIUM JACKET.(TYP.J ROOF AND SEAL WEATHER-TIGHT.ROUTE DOWN TO ASSOCIATED FAN COIL UNIT.PROVIDE WITH PIPE <br /> Z/BXHAUST <br /> CURB AND CHASE WITH GOOSENECKROOF AIR 6. SUPPLYAND RETURN AIR DUCTWORK DOWN THROUGH ROOF.PROVIDE SUPPLY AND RETURN AIR <br /> O PDUCT MAINS WITH MINIMUM 1 THICK DUCT LINER FOR THE FIRST IU-01 FROM UNIT. <br /> 7. OUTSIDE AIR INTAKE SHALL BE LOCATED AT LEAST 10 FEE)AWAY FROM ALL EXHAUST AND <br /> PLUMBING VENTS. <br /> (PTUPPEP�' <br /> CU-3 <br /> SS LBOUTSIDE AIR ICU-2 ROOFCAP <br /> 3RTS <br /> 55 LB 85 LB / MECHANICAL GENERAL NOTES: <br /> 1. HVAC WORK CONSISTS OF PROVIDING AIR CONDITIONING SYSTEMS FOR A COMPLETE OPERATING <br /> SYSTEM AS INDICATED ON THE DRAWINGS.ALL WORK SHALL COMPLY WITH APPLICABLE CODES IN <br /> SPECIFICATONS.IT IS THE INTENTION OF THE CONTRACT DRAWINGS AND SPECIFICATION TO CALL Ln <br /> ---_ FOR COMPLETE,FINISHED WORK,TESTED,AND READY FOR OPERATION. 0) i, <br /> 2. AN AIR BALANCE SHALL BE PERFORMED BY AN APPROVED INDEPENDENT THIRD PARTY AIR BALANCE qiq W <br /> CONTRACTOR IN ACCORDANCE WITH THE LATEST EDITION OF STANDARDS PUBLISHED BY THE <br /> ASSOCIATED AIR BALANCE COUNCIL(AABC),THE NATIONAL ENVIRONMENTAL BALANCING BUREAU <br /> (NEBB),OR THE TESTING,ADJUSTING,AND BALANCING BUREAU(TABB).BALANCE EACH SUPPLY, Q C <br /> RETURN,EXHAUST AND OUTSIDE AIR DEVICE WITHIN 57.OF REQUIREMENTS AND FURNISH A REPORT G <br /> TO THE CONSTRUCTION MANAGER.THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE,BALANCED, O 1„ O <br /> AND APPROVED BY THE OWNER'S REPRESENTATIVE.THE SUBMITTAL OF A CERTIFIED AIR BALANCE ¢ W <br /> ROOF REPORT AND OUTSIDE AIR CERTIFICATION ARE REQUIRED PRIOR TO OCCUPANCY.AN AIR BALANCE 0 J W N <br /> HATCH / TEST WILL BE REQUIRED TO VERIFY THE PROPER VOLUME OF OUTSIDE AIR TO COMPLY WITH LOCAL 00 <br /> CODES,BEFORE FINAL APPROVAL OF THIS PROJECT. wO a h <br /> 3 ALL DUCT SIZES SHOWN ARE SHEET METAL SIZES AND MUM <br /> NSULATION IN UNCOND TONED SPACE.INSULATE ALL ROOUND ACCUNTDUOCT EXT RNAALLY,XFR INSULATION.MINIC PT EXHAUST W C (� Q <br /> DUCTS,WITH 2.'FIBERGLASS INSULATION WITH VAPOR BARRIER.INSULATE ALL RECTANGULAR DUCT G Q Q <br /> WITH 1"-THICK,1-1/2 LB.DENSITY DUCT LINER.TAPE ALL JOINTS. yyiy <br /> 4. PROVIDE SPIN-IN FITTINGS AT ALL FLEXIBLE DUCT RUN OUTS TO DIFFUSERS(NO EXTRACTOR)AND may. 1 Z II <br /> DAMPER.SEE DETAIL 4/M0.1 FOR MORE INFORMATION. <br /> 5. MAXIMUM LENGTH OF FLEXIBLE DUCT SHALL BE 6-0". ` Q Q M W <br /> / <br /> RTU-1 RTU-2 6. ALL PIPING SUBJECT TO THERMAL EXPANSION AND/OR CONTRACTION THAT PENETRATES A SMOKE, W Q W <br /> 4.0 TONS 4.0 TONS FIRE,OR FIRE/SMOKE WALL,PARTITION,OR FLOOR SLAB SHALL BE SUITABLY SLEEVED AND FIRE-SAFED. `` <br /> 650 LBS 650 LBS 7. METAL DUCTS WHICH PENETRATE 1 HOUR RATED FIRE WALLS AND ARE LESS THAN 100 SQUARE Z / <br /> 2 2 INCHES SHALL EXTEND A MINIMUM OF 5 FEET ON BOTH SIDES OF THE WALL WITHOUT AN OPENING W W <br /> (TO PRECLUDE THE REQUIREMENT OF A FIRE DAMPER).DUCTWORK SHALL IN NO CASE BE LIGHTER ,w J <br /> THAN 24 GAUGE STEEL. Q L <br /> 8. PROVIDE IDENTIFICATION OF THE LOCATION OF ALL FIRE AND BALANCING DAMPERS. N <br /> IDENTIFICATION TAGS SHALL BE AFFIXED TO THE WALLS OR CEILINGS AND SHALL BE VISIBLE FROM THE T <br /> OCCUPIED SPACE. V �� <br /> 9. PROVIDE ORANGE TAGS ON ALL VOLUME AND BALANCING DAMPERS ABOVE THE CEILING.TAGS <br /> AND DAMPER HANDLES SHALL BE VISIBLE AND ACCESSIBLE FOR THE TEST&BALANCE AGENCY. <br /> 6 b 10. ALL PIPING SHALL BE SUPPORTED WITH COMMERCIAL MANUFACTURED CLAMPS.PROVIDE <br /> ISOLATION SLEEVES TO PREVENT CONTACT OF DISSIMILAR METALS. <br /> 11. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURERS'INSTRUCTIONS AND <br /> 4 RECOMMENDATIONS. <br /> 12. CONTRACTOR TO PROVIDE ALL SUPPLEMENTARY STEEL REQUIRED TO SUSPEND MECHANICAL <br /> EQUIPMENT AND MATERIALS. <br /> 13. ALL INSULATION SHALL BE FIRE RATED IN ACCORDANCE WITH NFPA 90A 50/25 SMOKE <br /> DEVELOPMENT AND FLAME SPREAD REQUIREMENTS.INSULATION 7'VALUES SHALL COMPLY ARCHITECT/ENGINEER OF RECORD <br /> APPLICABLE ENERGY CODE. <br /> 14. MOUNT ALL SPACE THERMOSTATS AND/OR SENSORS 44"ABOVE THE FLOOR,UNLESS OTHERWISE PM <br /> NOTED. <br /> 15. INSTALL DUCT MOUNTED SMOKE DETECTORS(FURNISHED BY DIVISION 16)IN SUPPLY AIR DUCTWORK <br /> CONNECTED TO HEAT PUMP UNIT.WIRE DUCT MOUNTED SMOKE DETECTORS SUCH THAT DESIGN <br /> ACTIVATION WILL DE-ENERGIZE AIR HANDLING UNIT FAN.LOCATE DUCT MOUNTED SMOKE <br /> DETECTORS THE REQUIRED DISTANCE DOWNSTREAM FROM BENDS OR INLETS AS RECOMMENDED BY Architectural <br /> THE MANUFACTURER. Solutions Group <br /> 16. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT. <br /> 17. UNLESS OTHERWISE NOTED,INSTALL ALL DUCTWORK AS HIGH AS POSSIBLE,TIGHT TO THE BOTTOM OF 3860 BROADWAY STREET <br /> THE STRUCTURE.COORDINATE ELEVATION AND LOCATION WITH RAIN LEADERS,WATER PIPING, SUITE 110 <br /> PLUMBING VENTS,AND MAJOR ELECTRICAL CONDUITS OR CABLE TRAY.SEE DETAIL 3/M0.1 FOR AMERICAN CANYON, CA 94503 <br /> MORE INFORMATION. CONTACT: ARIANE SANDERS <br /> 5 18. THE ENGINEER HAS MADE AN EXTENSIVE EFFORTTO IDENTIFY ABOVE CEILING CONFLICTS.THE PMASA 7m sPMDGINo <br /> EMAIL: ASANDER$®PMDGINC.COM <br /> CONTRACTOR IS RESPONSIBLE TO CHECK FIELD CONDITIONS PRIOR TO BIDDING AND REPORT ANY <br /> PROBLEMS/CONFLICTS TO THE ENGINEER WITHIN 2 DAYS OF DISCOVERY.ANY CHANGES RESULTING <br /> FROM CONDITIONS ARISING IN THE FIELD WHICH WERE NOT BROUGHT TO THE ENGINEER'S KEN MCCRACKEN, ARCHITECT <br /> ATTENTION ARE TO BE MADE BY THIS CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. <br /> � <br /> 19. THE WORK INDICATED ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO I <br /> CONVEY THE SCOPE OF WORK AND INDICATE THE GENERAL ARRANGEMENT OF DUCTWORK AND <br /> EQUIPMENT,ETC. amen o�,e�11 <br /> 20. ALL WORK IS TO BE FREE OF DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE(1) <br /> YEAR FROM DATE OF FINAL ACCEPTANCE.ALL DEFECTS WHICH DEVELOP OR ARE DISCOVERED SEAL <br /> WITHIN THIS PERIOD SHALL BE REPAIRED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER 0Q��Do�O <br /> AT NO ADDITIONAL COST TO THE OWNER. O066�,MA/y�O�o <br /> 21. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT,THE CONTRACTOR SHALL REMOVE ALL �O <br /> TOOLS,APPLIANCES,SURPLUS MATERIALS,AND SCRAP.ALL IDENTIFIED EXISTING EQUIPMENTTO BE <br /> REMOVED SHALL BE TURNED OVER TO THE OWNER. p _ <br /> 22. WHEN CONFLICTS OCCUR IN SPECIFICATIONS OR IN THE DRAWINGS,OR BETWEEN EITHER,THE ITEMS O qO <br /> OF GREATER QUANTITY OR HIGHER COST SHALL BE PROVIDED. �ci ,' 5386Op <br /> 23. THE CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES IN ORDER TO AVOID CONFLICTS. <br /> 24. PROVIDE BALANCING DAMPER IN EACH BRANCH CONNECTION,SEE DETAIL 12/M0.1 FOR MORE �Oppp00 <br /> INFORMATION ON MANUAL BALANCE DAMPER. R r C <br /> - V / 25. ALL DUCTWORK INSTALLED ON THIS PROJECT SHALL BE OF SHEET METAL CONSTRUCTION.DUCTWORK1 1 O B l V O N <br /> SHALL BE FABRICATED AND CONSTRUCTED IN ACCORDANCE WITH SMACNA REQUIREMENTS. <br /> 26. ALL ROOF ATTACHED EQUIPMENT AND APPURTENANCES INCLUDED IN THE SCOPE OF THIS PROJECT ENGINEERING,INC <br /> ARE REQUIRED TO BE SECURED TO THE UNDERLYING BUILDING STRUCTURE.THE FASTENING SYSTEMS 19401 40TNA E W SUITE 302,LYNNwooD,WA 98036 <br /> SHALL BE INSTALLED TO RESIST THE WIND PRESSURES ON THE EQUIPMENT AS DETERMINED IN TEL 206364 343 FAN:425'-838 098 <br /> ACCORDANCE WITH THE CURRENT BUILDING CODE. RDP-c.No:4241921 i CoN­:S mE McCw,E <br /> 27. MECHANICAL CONTRACTOR SHALL PROVIDE NAMEPLATE INFO TO THE FACILITY MANAGER FOR ALL ISSUE DATE DESCRIPTION <br /> FAN COILS,CONDENSING UNITS, AND EXHAUST FANS. <br /> 28. ALL REFRIGERANT SHALL BE R-410A.A.NO R-22 SHALL BE USED. <br /> 29. ALL HVAC UNITS TO BE PROPERLY LABELED.ALL CONTROL DEVICES AND SENSORS SHALL BE LABELED <br /> AS ASSOCIATED WITH THE HVAC UNIT.(I.E.CU-1,FC-1,ETC.) <br /> 30. SUBMITTAL OF A CERTIFIED AIR BALANCE REPORT AND OUTSIDE ARE CERTIFICATION ARE <br /> REQUIRED PRIOR TO OCCUPANCY. <br /> I I <br /> I I I <br /> 05/05/23 SUBMITTAL SET <br /> PROJECT INFORMATION BLOCK <br /> A B C F G H J JOB# CBR22023.0 <br /> DATE: 3/24/2023 <br /> DRAWN BY: PM <br /> CHECKED BY: AS <br /> MODEL <br /> DRAWING STANDARDS V20.5 <br /> SHEET TITLE <br /> MECHANICAL <br /> ROOF PLAN <br /> V SHEET NUMBER <br /> MECHANICAL ROOF PLAN SCALE <br /> „4'-,, M2.2 <br />