My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Caliber Security LLC 11/8/2024 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Caliber Security LLC 11/8/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2024 1:42:15 PM
Creation date
11/12/2024 1:42:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Caliber Security LLC
Approval Date
11/8/2024
End Date
12/31/2025
Department
Information Technology
Department Project Manager
Rick Bailey
Subject / Project Title
Social engineering / physical penetration testing at water & wastewater plants
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003270
Total Compensation
$50,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Statement of Work <br />Project Name:Security Services <br />Objectives:Provide network security services to help augment the work performed by the City’s technology <br />and security team.The scope of this SOW covers the following services: <br />Description &Scope:The engagement includes the services as outlined.The following table includes <br />specific details regarding the scope of services proposed: <br />●Physical Security Assessment –This assessment will target the City of Everett Lake Chaplain Water <br />Treatment Plant and the Everett Wastewater Treatment Plant.Caliber Security Partners will design and <br />execute a campaign that attempts to gain unauthorized access and access to sensitive information, <br />with limitations to such activities as described herein. <br />●Weekly status reports -to be performed as an email update or via phone or web-based calls. <br />Service Tier Description Pricing <br />Project Kickoff <br />Project kickoff meeting via phone call and/or web conference to <br />discuss and finalize the following: <br />●Service delivery schedule <br />●Emergency escalation contacts <br />●Rules of engagement <br />●Communication preferences
The URL can be used to link to this page
Your browser does not support the video tag.