Laserfiche WebLink
0 <br /> CLADDING PER ELEVATIONS CLADDING PER ELEVATIONS <br /> b <br /> o <br /> WEATHER RESISTANT BARRIER,LAP OVER PRE a"5 <br /> STRIPPING AT WINDOW OPENING R-10 HEADER INSULATION <br /> L <br /> VERTICAL RAIN SCREEN FURRING FIBER CEMENT PANEL 0 3 <br /> CONTINUOUS SEALANT AT CLADDING PER FIBER CEMENT LAP SIDING - <br /> STRIPS - GWB TO FRAMING ELEVATION KEYNOTES, PER ELEVATION KEYNOTES ¢� <br /> - LOCATE JOINTS AS <br /> SEALANT BETWEEN W.R.B.& PERIMETER FOR AIR .. <br /> PERIMETER SEBARRIER CONTINUITY INDICATED ON <br /> AM TAPE OR S.A.M. <br /> ` -fir ARCHITECTURAL I J <br /> CONTINUOUS SEALANT AT L ELEVATIONS <br /> GWB TO FRAMING 24 GA.PREFINISHED CONTINUOUS DRIP ---- - -- - COMPATIBLE EXTRUDED <br /> PERIMETER FOR AIR -,, FLASHING,MIN.3"LEG&UPTURNED END DAMS - ALUMINUM HORIZONTAL TRIM <br /> BARRIER CONTINUITY I BY VERTICAL FIBER CEMENT <br /> W.R.B WEATHERER SEAM TAPE OR I PANEL MANUFACTURER.PREP <br /> W.R.B.SEAM TAPE OR ADHERING RESILIENT FLASHING ER BARRIER, <br /> RAINSCREEN VERT. LAP TH MIN.AT CORNER PRIMED FIELD PAINT TO <br /> I , <br /> -SELF-ADHERING RESILIENT FLASHING FURRING STRIPS MATCH ADJACENT CLADDING <br /> SIDE OF R.O. - TOP OF R.O, I m o <br /> - --- -- -- - l� COMPATIBLE EXTRUDED o <br /> R VERT. WEATHER BARRIER <br /> COMPATIBLE EXTRUDED ALUMINUM VERTICAL ALUMINUM VERTICAL TRIM BY FURRINGURRING STRIPS <br /> RIPS ¢ <br /> 03 <br /> SIZE PER ELEVATIONS FIBER CEMENT PANEL ' <br /> WINDOW TRIM, FIBER CEMENT PANEL <br /> TRIM BY FIBER CEMENT PANEL MANUFACTURER.PRE- COMPATIBLE EXTRUDED CLADDING PER ELEVATION - <br /> MANUFACTURER PRIMED,FIELD PAINT TO <br /> BACKER ROD&SEALANT MATCH ADJACENT CLADDING ALUMINUM OUTSIDE KEYNOTES,LOCATE JOINTS %m m <br /> BACKER ROD&SEALANT CORNER BY FIBER AS INDICATED ON <br /> GYPSUM WALLBOARD WITH PVA PRIMER WEATHER BARRIER CEMENT PANEL ARCHITECTURAL ELEVATIONS <br /> GYPSUM WALLBOARD WITH PVA PRIMER CEMENT PANEL ER C MANUFACTURER.PRE- <br /> PVC WINDOW PER WINDOW SCHEDULE, FIB PRIMED,FIELD PAINT TO FURRING STRIPS— <br /> INSTALL VERT. <br /> PVC WINDOW PER WINDOW SCHEDULE, INSTALL PER MANUFACTURER'S CLADDING PER ELEVATION MATCH ADJACENT <br /> INSTALL PER MANUFACTURER'S RECOMMENDATIONS KEYNOTES,LOCATE JOINTS AS CLADDING FURRING STRIPS <br /> RECOMMENDATIONS INDICATED ON ARCHITECTURAL <br /> ELEVATIONS ��� <br /> WINDOW JAMB-WITH PANEL n WINDOW-HEAD WITH TRIM 3 LADDING-VERITCAL JOINT,FIBER CEMENT PANEL ^ 3 LADDING-OUTSIDE CORNER,FIBERT CEMENT PANEL C CLADDING-HORIZONTAL JOINT,FIBER CEMENT LAP TO PANEL w <br /> 1 3"=1' L _ �+ J / <br /> RAINSCREEN VERT. RAINSCREEN VERT.FURRING STRIPS <br /> CLADDING PER ELEVATIONS FIBER CEMENT PANEL FURRING STRIPS 4 <br /> CLADDING PER ELEVATION FIBER CEMENT CLADDING PER ELEVATION <br /> CLADDING PER ELEVATIONS ww.bn smmuk <br /> VERTICAL RAINSCREEN FURRING STRIPS KEYNOTES,LOCATE JOINTS AS FIBER CEMENT PANEL KEYNOTES.LAP SIDING SHOWN;FIBER <br /> CONTINUOUS SEALANT AT INDICATED ON ARCHITECTURAL CLADDING PER CEMENT PANEL SIMILAR,PROVIDE ALUM. - <br /> R-10 HEADER INSULATION GWB TO FRAMING ELEVATIONS _ ELEVATION KEYNOTES, HORIZONTAL TRIM STRIP AT BOTTOM <br /> AS LOCATE JOINTS INSECT PERIMETER FOR AIR RAINSCREEN VERT. WRAP SCREEN <br /> CONTINUOUS SEALANT AT INDICATED ON <br /> -II <br /> I BARRIER CONTINUITY FURRING STRIPS <br /> GWB TO FRAMING PERIMETER FOR AIR ARCHITECTURAL - <br /> CONT.24 GA.MIN.PREFINISHED <br /> BARRIER CONTINUITY WEATHER RESISTIVE BARRIER, ELEVATIONS THROUGH-WALL FLASHING,1/2"MIN. <br /> LAP OVER PRE-STRIPPING AT COMPATIBLE EXTRUDED AIRGAP BETWEEN FLASHING&CLADDING <br /> SEALANT BETWEEN HEAD FLASHING& ALUMINUM VERTICAL J- <br /> PERIMETER SEAM TAPE OR S.A.M. WINDOW OPENING <br /> CHANNEL BY FIBER CEMENT :� WEATHER BARRIER,R, ADHERED MANUFACTURED STONE <br /> WEATHER RESISTANT BARRIER,LAP OVER HEAD WINDOW TRIM,SIZE PER ELEVATIONS PANEL MANUFACTURER.PRE- LAP 12"MIN.AT CORNER WATERTABLE CAP,INSTALL PER <br /> - FLASHING WITH CONTINUOUS SEALANT PRIMED,FIELD PAINT TO MANUFACTURER REQUIREMENTS <br /> I INSECT SCREEN W.R.B.SEAM TAPE OR MATCH ADJACENT CLADDING <br /> 1 SELF-ADHERING RESILIENT FLASHING <br /> WEATHER BARRIER,LOWER COURSE ` <br /> TOP OF R.O.JI SIDE OF R,OJ1 COMPATIBLE EXTRUDED TUCK UNDER THROUGH-WALL FLASHING <br /> _. _... Y ALUMINUM INSIDE `^ <br /> CORNER BY FIBER v l <br /> 24"GA,PREFINISHED CONTINUOUS DRIP CEMENT PANEL Z <br /> S — <br /> G&UPTURNED END DAM 2 LAYERS BUILDING PAPER <br /> FLASHING,MIN.3'LE MANUFACTURER O <br /> BACKER ROD 8 SEALANT <br /> 'W.R.B.SEAM TAPE OR SELF- WEATHER BARRIER OR WEATHER BARRIER Q <br /> Q <br /> ADHERING RESILIENT FLASHING MORTAR SCRATCH COAT <br /> W/EXPANDED METAL LATH <br /> BACKER ROD&SEALANT GYPSUM WALLBOARD WITH PVA PRIMER Q W <br /> FIBER CEMENT LAP SIDING PER <br /> ELEVATION KEYNOTES ADHERED MANU-FACTURED STONE <br /> GYPSUM WALLBOARD WITH PVA PRIMER PVC WINDOW PER WINDOW SCHEDULE, VENEER PER ELEVATION KEYNOTES <br /> PVC WINDOW PER WINDOW SCHEDULE, INSTALL PER MANUFACTURER'S �J <br /> INSTALL PER MANUFACTURER'S RECOMMENDATIONS <br /> RECOMMENDATIONS <br /> 6 WINDOW HEAD-WITH PANEL WINDOW JAMB-WITH TRIM p CLADDING-VERTICAL JOINT,FIBER CEMENT PANEL TO LAP 3 CLADDING-INSIDE CORNER,FIBER CEMENT PANEL O 3 CLADDING-HORIZONTAL JOINT,FIBER CEMENT LAP TO STONE <br /> O ADHERED MANUFACTURED STONE <br /> VENEER PER ELEVATION KEYNOTES <br /> PVC WINDOW PER WINDOW SCHEDULE, MORTAR SCRATCH COAT W/ FIBER CEMENT PANEL <br /> INSTALL PER MANUFACTURER'S EXPANDED METAL LATH CLADDING PER ELEVATION <br /> IT—CLADDING PER ELEVATIONS RECOMMENDATIONS KEYNOTES,LOCATE JOINTS <br /> CONTINUOUS SEALANT AT GWB TO FRAMING (2)LAYERS BUILDING PAPER OR AS INDICATED ON <br /> AV <br /> WEATHER BARRIER ARCHITECTURAL ELEVATIONS <br /> R-10 HEADER INSULATION PERIMETER FOR AIR BARRIER CONTINUITY FIBER CEMENT CLADDING <br /> FFPER ELEVATION KEYNOTES <br /> WEATHER RESISTIVE BARRIER, GYPSUM WALLBOARD COMPATIBLE EXTRUDED C U <br /> ALUMINUM HORIZONTAL TRIM Q O J LAP OVER HEAD FLASHING ALT:WOOD OR M.D.F.SILL BY VERTICAL FIBER CEMENT 01 <br /> - &APRON AT OWNER'S WEATHER BARRIER <br /> W.R.B.HEAD FLASHING OR SELF- OPTION <br /> - ADHERING RESILIENT FLASHING,INSTALL LAP A MIN.AT CORNER, PANEL MANUFACTURER.PRE- S <br /> TAPE ALL SEAMS PRIMED,FIELD PAINT TO ycc <br /> PER MANUFACTURER'S O SEALANT MATCH ADJACENT CLADDING j ❑ <br /> RECOMMENDATIONS <br /> m _BOTTOM OF R,O� RAINSCREEN VERT. <br /> -- 24 GA.PREFINISHED CONTINUOUS DRIP Y FURRING STRIPS I WEATHER BARRIER,UPPER = 0 <br /> FLASHING,MIN.3"LEG&UPTURNED END DAMS BACKER ROD&SEALANT .I COURSE LAP OVER COURSE f N ❑ <br /> CONTINUOUS BELOW ` Q) cc <br /> DRAINAGE SHIMS AT TOP&FRONT FACES ".I <br /> TRIM,SIZE PER ELEVATIONS COMPATIBLE O <br /> SILL PLAN FLASHING WITH BACKDAM r. '� SEALANT •- - <br /> IA <br /> TOP OFRO� ___ __ ". .._: I -.,I <br /> � WINDOW TRIM,SIZE PER ELEVATIONS FIBER CEMENT LAP SIDING <br /> CONTINUOUS SEALANT AT - I z <br /> GWB TO FRAMING COMPATIBLE SEALANT ; PER ELEVATION KEYNOTES U <br /> U Q <br /> PERIMETER FOR AIR WD.OR FIBER CEMENT ui <br /> d <br /> BARRIER CONTINUITY P.T.2X2 TOM.WD.TRIM 54S" CORNERBOARDS,2X4 /� <br /> SEALANT WEATHER RESISTIVE BARRIER, CONTINUOUS COMPATIBLE SEALANT CUTI&SEAHER <br /> L ALL JO ITS, ' FURRING STR SINSCREEN RT W <br /> FILL ROUGH OPENING PERIMETER TUCK UNDER SILL LINER RAINSCREEN VERT.FURRING STRIPS PAINT COLOR TO - <br /> WITH CLOSED-CELL SPRAY FOAM CLADDING PER ELEVATIONS FIBER CEMENT LAP SIDING PER ELEVATION MATCH ADJACENT <br /> KEYNOTES CLADDING <br /> DOORFRAME <br /> d EXTERIOR DOOR-HEAD WINDOW-SILL WITH TRIM 13 3 LADDING-VERTICAL JOINT,FIBER CEMENT LAP TO STONE ^ A CLADDING-OUTSIDE CORNER WITH CORNERBOARDS 3 LADDING-HORIZONTAL JOINT,FIBER CEMENT PANEL TO LAP <br /> �11 3„=1, IMF <br /> 15 <br /> a <br /> ° PVC WINDOW PER WINDOW SCHEDULE, <br /> s :y <br /> '£ INSTALL PER MANUFACTURER'S m <br /> RECOMMENDATIONS CONTINUOUS RAINSCREEN VERT. m <br /> � <br /> FURRING STRIPS, COMPATIBLE SEALANT � <br /> CONTINUOUS SEALANT AT GWB TO FRAMING <br /> PERIMETER FOR AIR BARRIER CONTINUITY <br /> CLADDING PER ELEVATIONS O ' <br /> s° RAINSCREEN VERT. <br /> E WEATHER RESISTIVE BARRIER GYPSUM WALLBOARD FURRING STRIPS 2X2 TOM.WD. COMPATIBLE EXTRUDED <br /> ALT:WOOD OR M.D.F.SILL ALUMINUM HORIZONTAL TRIM U <br /> r &APRON AT OWNER'S BY VERTICAL FIBER CEMENT /� a <br /> o OPTION FIBER CEMENT CLADDING PANEL MANUFACTURER.PRE- w <br /> CONTINUOUS SEALANT AT WEATHER BARRIER,UPPER PER ELEVATION KEYNOTES PRIMED,FIELD PAINT TO <br /> '- CGWBON TO FRAMING SEALANT COURSE LAP OVER THROUGH- <br /> i <br /> MATCH ADJACENT CLADDING v <br /> PERIMETER FOR AIR WALL FLASHING WEATHER BARRIER, L <br /> BARRIER CONTINUITY LAP 12"MIN.AT CORNER <br /> d _ BOTTOM OF R.O v JOB NO.: <br /> . � - - � FIBER CEMENT CLADDING WEATHER BARRIER,UPPER <br /> BACKER ROD&SEALANT PER ELEVATION KEYNOTES COURSE LAP OVER COURSE E 22205 <br /> TRIM,SIZE PER ELEVATIONS ;Ai COMPATIBLE EXTRUDED ALUMNIUM BELOW— <br /> HORIZONTAL EDGE TRIM BY FIBER CEMENT WRAP INSECT SCREEN - v PLOT DATE <br /> PANEL MANUFACTURER <br /> DRAINAGE SHIMS AT TOP 8 FRONT FACES CONT.24 GA.MIN. e/4/2023 10:45:43 AM <br /> PREFINISHED THROUGH- FIBER CEMENT CLADDING - <br /> SEALANT SILL PLAN FLASHING WITH BACKDAM WALL FLASHING,INSTALL AT PER ELEVATION KEYNOTES -'DATE: O6/08/2023 <br /> EVERY 2 FLOORS OR 20' <br /> E VERTICAL RAINSCREEN FURRING STRIPS 112"MIN.AIRGAP BETWEEN ;,SCALE: 3"=V-0" <br /> FILL ROUGH OPENING PERIMETER FLASHING&CLADDING <br /> o WITH CLOSED-CELL SPRAY FOAM COMPATIBLE SEALANT DRAWN <br /> DOOR FRAME WEATHER RESISTIVE BARRIER, WEATHER BARRIER, a : MB <br /> k— LOWER COURSE TUCK <br /> TUCK UNDER SILL LINER UNDER THROUGH-WALL CGENEFlAL SHEETS <br /> M <br /> CLADDING PER ELEVATIONS FLASHING iO SHEET NO.: <br /> f <br /> h EXTERIOR DOOR-JAMB WINDOWSILL-WITH PANEL CLADDING-THROUGH WALL FLASHING CLADDING-INSIDE CORNER,FIBER CEMENT LAP SIDING CLADDING-HORIZONTAL JOINT,FIBER CEMENT PANEL A23 <br /> =16 3„=V 17 3„_1, 18 3„=1, 19 3„=1, 20 3„=1, <br /> U <br />