My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST PILCHUCK HALL 2024-12-09
>
Address Records
>
TOWER ST
>
2000
>
PILCHUCK HALL
>
2000 TOWER ST PILCHUCK HALL 2024-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 11:03:07 AM
Creation date
11/12/2024 3:55:12 PM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
PILCHUCK HALL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLUMBING PERMIT Permit Number: P2408-035 <br /> 0 Permit Type: PLUMBING <br /> City of Everett Permit Subtype: STANDARD PLUMBING <br /> E V E R E T T Permit Services PERMIT <br /> WASHINGTON PermitServices@everettwa.gov 1425.257.8810 Date Issued: 8/21/2024 <br /> Request Inspections:OnIine Perm its.everettwa.gov <br /> Residential Sinks:0 Electric Water Heater: 0 <br /> Toilet:0 Other Plumbing Fixtures:2 <br /> Urinal:0 Medical Gas:0 <br /> PERMIT CONDITIONS: <br /> CONDITION TYPE CONTACT DATE ADDED DATE REQUIRED DATE SATISFIED STATUS REMARKS <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all claims for <br /> damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right-of-way use here to <br /> applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This permit <br /> may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date 180 days to keep the <br /> permit open while work is active. <br /> E V E R E T T Permit No.: P2408-035 Page 2 of 2 <br /> WASHINGTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.