My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
230 W MUKILTEO BLVD 2024-12-05
>
Address Records
>
W MUKILTEO BLVD
>
230
>
230 W MUKILTEO BLVD 2024-12-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2024 1:19:10 PM
Creation date
11/13/2024 9:29:20 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
230
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> PUBLIC WORKS UTILITY <br /> Date Applied: 8/23/2019 <br /> PERMIT PW Utility Permit M PW1908-050 <br /> E V E R E T T City of Everett Permit Services Parent Permit#: <br /> 3200 Cedar Street, 2"d Floor Permit Type: PUBLIC WORKS UTILITY <br /> WASHINGTON Everett, WA 98201 Permit Subtype: OTHER ROW WORK <br /> 425-257-8810 Permit Fee: $1,069.00 <br /> UTILITY COMPANY NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> MCI Metro Access Transmission Services, Corp Arnaldo Blanco <br /> 324S, 1S8TH Ave SE 3000, E Cesar Chavez St. <br /> BELLEVUE,WA,98008 Austin,TX,78702 <br /> PHONE:4252293123 PHONE: 7873492960 <br /> TAX PARCEL ID#:00449500008300 SITE ADDRESS: 230 W MUKILTEO BLVD <br /> DESCRIPTION: MCI Metro Franchise Permit#1801AVAO.16_ROW_EVT_2435 <br /> Underground installation of conduit and cable pulling. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 2. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 3. Traffic Control must be done in accordance with MUTCD Standards and the Traffic Control Plan approved by City of Everett dated <br /> 09/24/2019. <br /> 4. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as directed by the <br /> City PW Inspector. <br /> 5.Street restoration must be done per COE Standard Drawing#326 and trench restoration per#614, or as directed by the City PW <br /> Inspector. Permanent restoration must be completed within 2 weeks of completion of utility work. <br /> 6. Full lane width grind and overlay is required for trenches greater than 100' in length, multiple cuts within a 100' length section, <br /> and/or as directed by the City PW Inspector. <br /> 7. A minimum of 5ft separation between City of Everett utilities and directional boring/pavement cuts shall be maintained. <br /> 8. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Inspections are required for job start notification, potholing all City utilities,evaluation of traffic <br /> control set-up,to view the work prior to backfill,and after final restoration to final the permit. <br /> 9. Potholing required for all crossings over/under City of Everett water mains. <br /> 10. Coordinate with adjoining businesses/homeowners to minimize obstruction of commerce/access. <br /> Public Works Permit Fee Breakdown: <br /> Cut/Bore Alley/Pavement(Parallel) (735 LF)..............$735.00 <br /> Cut/Bore Alley/Pavement(Non-Parallel) (98 LF)......$294.00 <br /> PWPlan Review........................................................$20.00 <br /> PW Site Inspection....................................................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> s� and all claims for damages,costs,expenses,or causes of action that <br /> 7/tad �j4 0�9�26'2�r� may arise because of installation and maintenance of the <br /> improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY 8E CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY OURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.