Laserfiche WebLink
��,r MATCH LINE B <br /> MATCH LINE A <br /> Q MINIMUM TAPER LENGTH=L(feet) <br /> j o LANE POSTED SPEED(mph) <br /> WIDTH <br /> (feet) 25 30 35 40 45 50 55 60 65 70 <br /> / 10 105 150 205 270 450 500 550 - - - <br /> 11 1 115 165 225 295 495 550 605 660 <br /> 12 1 125 180 245 320 540 600 660 720 780 <br /> W20-1 4tl3Htl 0 <br /> W4-2 R <br /> atloa O O BUFFER DATA <br /> ``� LONGITUDINAL BUFFER SPACE=B <br /> SPEED(MPH) 25 30 35 40 45 50 55 60 65 70 <br /> 200' � LENGTH(feet) 155 200 250 305 360 425 495 570 645 730 <br /> 200' <br /> NO PARKING SIGNS <br /> Barricade mounted, placed <br /> on the street 20ft apart. <br /> 72hrs prior to the start <br /> of work. <br /> O <br /> W20-5R 3N sm�ia n <br /> �o CD . <br /> 200' <br /> . <br /> MATCH LINE A <br /> N <br /> Taper 180' O <br /> <D � <br /> GENERAL NOTES <br /> • ALL WORK TO BE PERFORMED DURING c 100th St SW 30 a3a <br /> DAYTIME HOURS, UNLESS TRAFFIC ARROWBOARD <br /> VOLUMES OR MUNICIPALITY DICTATE <br /> OTHERWISE <br /> • ALL SIGNS ARE 48"X48" BLACK ON <br /> FLUORESCENT ORANGE UNLESS <br /> OTHERWISE NOTED <br /> • TRAFFIC SHALL NOT BE STOPPED IN ANY r <br /> ONE DIRECTION FOR MORE THAN 10 O`r N <br /> MINUTES <br /> • A PEDESTRIAN SPOTTER WILL BE USED AS ao W20-1 <br /> NEEDED TO ACCOMMODATE PEDESTRIANS N <br /> THROUGH THE WORK ZONE <br /> • WORK AREA TO INCLUDE STAGING AREA MATCH LINE B <br /> JOB#/PM# AGENCY PRIME CONTRACTOR TCP QUESTIONS CALL: MPH TAPER SIGN SPACING TAPER TANGENT <br /> 1801AVA0.19_ROWI_EVT_2019 EVERETT FORESITE 209-400-7075 rt CITY 30 180' 200' 30' 60' <br /> PREPARED BY INITIALS <br /> CITY RISE, INC A.Q. RISE SHIFTTAPER= 1/2TAPER <br /> SHEET# PROJECT LOCATION SCALE <br /> SHEET 2 4th Ave W, Everett WA DATE PREPARED NOT TO SCALE SHOULDER TAPER= 1/3TAPER <br /> 07/22/2019 WORK AREA <br />