Laserfiche WebLink
Scope of Work <br />continued <br />City of Everett 6 <br />Dorn Ave. Drainage Improvements Otak <br /> No changes to the existing condition model will be needed. <br /> Downstream impacts modeling will be limited to comparisons in peak flow and velocity. Wetland <br />hydroperiod analysis will not be performed. <br /> <br />5. Options Analysis <br />5.1 Options Analysis for Solution Element 2 Outfall <br />This task will determine the ultimate outfall location for the McGill Avenue bypass. The prior alternatives <br />analysis identified an option 2a that directs the outfall to McGill Pond, or option 2b which outlets directly to <br />North Creek. The city has indicated that McGill Pond is suspected to overflow and cause flooding of <br />McGill Avenue just south of the pond. The options analysis will include a solution to this flooding – likely <br />construction of a conveyance from the pond overflow spillway to North Creek that precludes road <br />flooding. <br /> <br />5.2 Options Analysis for Water Quality Treatment <br />The size and cost, at the alternatives analysis, were developed using the Contech Modular Wetland <br />System (MWS) which is Department of Ecology GULD certified for Enhanced Treatment. Conceptually, <br />this off-line treatment would involve a flow splitter at the depth of the proposed conveyance improvement. <br />The MWS has an upper size limit at approximately 0.9 cfs. To treat larger flows, multiple vaults would <br />need to be joined in parallel requiring additional connecting structures and space. Therefore, regional <br />treatment is more challenging at the Solution Element 1 (Dorn Avenue) location and multiple treatment <br />locations in the watershed or other water quality treatment techniques will be explored further in this task. <br />For Solution Element 2 (McGill Avenue) the configuration would change if the outfall was to North Creek <br />(less space would be available) instead of McGill Pond. The sizing performed for the alternatives analysis <br />was meant to approximate cost of water quality retrofit treatment for planning purposes for the entire <br />contributing area (public and private). <br />This task will revisit the water quality configuration at Dorn Avenue and provide configuration options that <br />provides maximum treatment area within or adjacent to the Solution Element 1 R/W limits. <br />The water quality treatment configuration options will also be completed at McGill (Solution Element 2). <br />These will be completed in tandem with the outfall options for Solution Element 2 – Task 5.1. <br />The configuration options will focus on: <br />· available area in roadway or R/W <br />· other area adjacent to the R/W <br />· vertical drop <br />