Laserfiche WebLink
Scope of Work <br />continued <br />City of Everett 11 <br />Dorn Ave. Drainage Improvements Otak <br />8.4 Prepare Project Specifications <br />Otak will prepare Special Provisions for Division 2 through 9 of the Specifications that are related to the <br />site civil bid items and plans. Special Provisions will be prepared based upon the 2024 (or current) Edition <br />of the Washington State Department of Transportation Standard Specifications for Road, Bridge, and <br />Municipal Construction and latest Amendments. Otak will work with the City to prepare the full Project <br />Manual including advertisement and bid forms, contract, Division 1, as well as any necessary <br />Appendices. An estimated number of working days for the contract will also be provided. <br /> <br />The City will provide the current City standard Bid Forms, Contract Provisions, and Special Provisions <br />Division 1 to Otak in electronic format. The City will also provide templates for Division 2 through 9. <br /> <br />8.5 Prepare Engineer’s Estimate (30%, 60%, 90%, and Final) <br />Engineering estimates of anticipated construction costs will be prepared at the 30%, 60%, 90% and final <br />levels. Estimates will be prepared using historical unit prices from similar projects, other current cost data, <br />and recent City projects (as available). The Engineer’s Estimate will be based on the Summary of <br />Quantities. Bid quantities will be organized into standard bid items, supplemented by additional non- <br />standard items, and conform to a project bid schedule. <br /> <br />8.6 Design Report <br />A design report will be prepared documenting the design, assumptions, and requirements. For <br />stormwater compliance, the Underground Utility Projects exemption per 1-3.2 of the Washington State <br />Department of Ecology Stormwater Management Manual applies since the utility project replaces ground <br />surface with in-kind material or materials with similar runoff characteristics. Therefore, minimum <br />Requirement 2 is the only requirement. Controls will be developed only for Construction SWPPP <br />Elements that pertain to the project site. An abbreviated stormwater site plan will be prepared. <br /> <br />The design report will include the following documentation: <br /> Project Overview <br /> Design Standards and Requirements <br /> Existing Conditions Summary <br /> Proposed Conveyance Design <br /> Hydrologic and Hydraulic Memorandum Summary including Off-Site Analysis <br /> Construction Stormwater Pollution Prevention Plan (considering 13 elements as they pertain to the <br />site in a narrative and drawing) <br /> Special Reports and Studies (Hydrologic and Hydraulic Memorandum and Geotechnical Report) <br />