Laserfiche WebLink
Doors: <br />Man doors were inspected for installation per builder's specifications. Sills <br />were inspected for correct sealing against water intrusion. <br />The areas inspected were observed to be completed with no outstanding <br />correction items. <br />Penetrations: (vents, lights, hose bibs, other) <br />Exterior envelope penetrations were inspected for correct application of <br />flashing material and sealing at the penetrations. <br />The areas inspected were observed to be completed with no outstanding <br />correction items. <br />Roofing: <br />Roof flashing was inspected for correction application at roof to wall areas <br />and other flashing areas for installation to building code. <br />The areas inspected were observed to be completed with no outstanding <br />correction items. <br />Final: <br />The building enclosure elements of the building were inspected during the <br />course of material application from window flashing to completion of the <br />siding and sealing of all penetrations. Materials are determined to be <br />installed to specifications, building code and to good industry standards. <br />Submitted by: <br />Diane Glenn <br />Construction Consultants of <br />Washington, LLC <br />Building Enclosure inspector <br />Office (425)709-6100 Cell (425)351-0940 40 Lake Bellevue, Suite 100, Bellevue, WA 98005 <br />