My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division P – PROPOSAL September 20, 2024 <br />Work Order No. – UP 3775 SP – 5 <br />Note: Unit prices for all items, all extensions, and the total amount bid must be shown. Where conflict occurs between the unit price and <br />the total amount named for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. All entries must be <br />typed or entered in ink. BID SCHEDULE <br /> BIDDER:___________________________ <br />Item <br />No. ITEM DESCRIPTION Unit Bid Qty UNIT PRICE TOTAL AMOUNT <br />Schedule A <br />1 Surveying LS 1 $_______.___ $______________.___ <br />2 Record Drawings LS 1 $_______.___ $______________.___ <br />3 Mobilization LS 1 $_______.___ $______________.___ <br />4 Force Account/ Unexpected Conditions FA 1 $25.000.00 $25,000.00 <br />5 Other Traffic Control Labor HR 240 $_______.___ $______________.___ <br />6 Maintenance and Protection of Traffic <br />Control LS 1 $_______.___ $______________.___ <br />7 Clearing and Grubbing AC 0.08 $_______.___ $______________.___ <br />8 HMA Sawcut LF 564 $_______.___ $______________.___ <br />9 Removing Asphalt Conc. Pavement SY 158 $_______.___ $______________.___ <br />10 Removing Cement Conc. Sidewalk SY 218 $_______.___ $______________.___ <br />11 Gravel Borrow Incl. Haul TON 305 $_______.___ $______________.___ <br />12 Trench Excavation Safety Systems LS 1 $_______.___ $______________.___ <br />13 Crushed Surfacing Base Course TON 108 $_______.___ $______________.___ <br />14 HMA Cl. 1/2 in. PG 64-22 TON 113 $_______.___ $______________.___ <br />15 Planing Bituminous Pavement (3-inch <br />Depth) SY 474 $_______.___ $______________.___ <br />16 Schedule A Storm Sewer Pipe 12 In. <br />Diam. LF 96 $_______.___ $______________.___ <br />17 Schedule A Storm Sewer Pipe 18 In. <br />Diam. LF 156 $_______.___ $______________.___ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.