Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division P – PROPOSAL September 20, 2024 <br />Work Order No. – UP 3775 SP – 8 <br /> <br />SUBCONTRACTORS FORM <br />1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel installation and rebar installation, Bidder MUST either identify itself or Subcontractors in the chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write “NO WORK”. <br />2. Bidder shall not list more than one Subcontractor for each category of work identified, unless Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate. <br />3. Bidder’s bid shall be deemed nonresponsive and void if: <br />A. For heating, ventilation, air conditioning, plumbing, electrical, structural steel installation and rebar installation, Bidder fails (1) to submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such Work, or (3) to write “No Work”; or B. Bidder names two or more Subcontractors to perform the same work. <br />4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar installation subcontractors applies only to proposed heating, ventilation and air conditioning, plumbing, electrical, structural steel installation and rebar installation subcontractors who will contract directly with the general contractor submitting the Bid to the City. <br />5. The heating, ventilation and air conditioning, plumbing, electrical portions of the chart below must be submitted with the bid proposal or within one hour of the published bid submittal time. <br />6. The structural steel installation and rebar installation portions of the chart below must be submitted with the bid proposal or within forty-eight hours of the published bid submittal time. <br /> <br />Type/Scope of Work Name and Address of Subcontractor/Or Bidder <br />HEATING <br />Subcontractor, bidder or “no work” MUST be <br />stated <br /> <br />VENTILATION AND AIR CONDITIONING Subcontractor, bidder or “no work” MUST be stated <br /> <br />PLUMBING (as described in RCW Chap. 18.106) Subcontractor, bidder or “no work” MUST be stated <br /> <br />ELECTRICAL (as described in RCW Chap. 19.28) Subcontractor, bidder or “no work” MUST be stated <br /> <br />STRUCTURAL STEEL INSTALLATION Subcontractor, bidder or “no work” MUST be stated <br /> <br />REBAR INSTALLATION Subcontractor, bidder or “no work” MUST be stated <br /> <br /> <br />