My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 2 – EARTHWORK September 20, 2024 <br />WO No. – UP 3775 SP – 135 <br />2-02.3(3)D1 Sawcutting <br />Make vertical full depth saw cut between existing cement concrete sidewalk <br />to remain and the portion to be removed at the nearest scribe marks beyond <br />the neat line limits, or to the nearest joint. <br />No diagonal cuts in sidewalk will be allowed unless otherwise indicated on the <br />Plans or directed by the Engineer. <br />2-02.3(3)E Removal of Catch Basins, Manholes, Inlets or Sumps <br />Excavate and completely remove the structure including, but not limited to, casting <br />and outlet trap, concrete encasement and bricks, as applicable to each removal <br />item listed in the Proposal. <br />Plug existing connecting pipes that remain by filling with Commercial Concrete a <br />minimum length of 24–inches into the pipe. Backfill shall be Gravel Borrow as <br />specified in 9-03.14(1). Compact backfill to a minimum of 95 percent maximum <br />density in accordance with 2-03.3(14)D. <br />2-02.3(4) Obliteration of Pavement Markings <br />(******) <br />Remove pavement markings where shown on the Plans or where designated by the <br />Engineer. Obliterate pavement marking until blemishes caused by the pavement <br />marking removal conform to the coloration of the adjacent pavement. If the pavement <br />is materially damaged by pavement marking removal operation, Contractor shall repair <br />the pavement damage, at the Contractor's expense, to a condition equal to existing <br />pavement that had no markings obliterated. Remove sand or other material deposited <br />on the pavement as a result of removing stripes and markings as the Work progresses <br />to avoid hazardous conditions. Accumulation of sand or other material that might <br />interfere with drainage will not be permitted. <br />2-02.3(5) Abandon Pipe In-place <br />(******) <br />Plug pipe ends of pipes designated on Plans being abandoned in-place using <br />commercial concrete. If designated on Plans, fill abandoned in-place pipe with <br />Controlled Density Fill as specified in 2-09.3(1)E. <br />2-02.3(6) Sawing and Line Drilling <br />(******) <br />Saw-cut to full depth mortared decorative or special pavement including, but not limited <br />to, brick, cobblestone or paver block along a neat line with intent of salvaging as many <br />units as possible. <br />When line drilling, drill holes at maximum center-to-center spacing of six-inches. Drill <br />holes perpendicular to the surface and penetrate completely through the pavement. <br />When the Plans indicate, or the Engineer requires, saw-cutting pavement that is <br />comprised of a rigid base and asphalt overlay, saw cut the rigid base to the minimum <br />depth as follows: <br />a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br />base. <br />b. For rigid base constructed with mortared decorative or special pavement <br />including, but not limited to, brick, cobblestone, or paver block, or a <br />combination of such materials saw cut to full depth of the rigid base along a <br />neat line with intent to salvage as many special pavement units as possible.
The URL can be used to link to this page
Your browser does not support the video tag.