My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 2 – EARTHWORK September 20, 2024 <br />WO No. – UP 3775 SP – 140 <br />All costs for the Work described in Section 2-07 shall be included with the Work with no <br />direct compensation made. <br />2-09 STRUCTURE EXCAVATION <br />2-09.2 Materials <br />Supplement 2-09.2 by adding the following at end of the materials list: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />2-09.3 Construction Requirements <br />2-09.3(1) General Requirements <br />2-09.3(1)C Removal of Unstable Base Material <br />Delete all paragraphs in 2-09.3(1)C and substitute the following: <br />When the material at the bottom of an excavation is not stable enough to <br />support the Structure, the Contractor shall excavate below grade to the depth <br />required by the Engineer and replace the unstable material with Foundation <br />Material Class A or B. <br />Place Foundation Material Class A or B in layers not more than six inches <br />thick and compact to minimum of 90-percent maximum density as determined <br />by 2-03.3(14)D. <br />Dispose of unsuitable material removed to make room for foundation material <br />by hauling to a waste site obtained and provided by the Contractor in <br />accordance with 2-03.3(7)C. <br />2-09.3(1)D Disposal of Excavated Material <br />Delete the second paragraph in 2-09.3(1)D and substitute the following: <br />All costs for disposing of excavated material, whether within the Project limits <br />or hauled to a disposal site, shall be incidental to the other Bid items in the <br />Proposal. The City will not pay for hauling. Disposal of excavated material <br />shall meet the requirements of 2-03.3(7)C. <br />2-09.3(1)E Backfilling <br />Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br />Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br />strength not to exceed 300-psi. Provide wet or flowable CDF with <br />consistency having approximate slump between three to ten inches. <br />Controlled Density Fill used for excavation backfill may be placed dry or wet. <br />Use wet, or flowable, CDF for filling abandoned pipes in-place. <br />Supplement 2-09.3(1)E by adding the following: <br />Where CDF is used in lieu of other materials such as foundation material, <br />gravel borrow, washed sand or crushed surfacing top course, the respective <br />limits for trench width or backfill dimensions shall be approved by the <br />Inspector. <br />2-09.3(3)B Excavation Using Open Pits – Extra Excavation <br />Revise the sixth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type <br />3E Working Drawings with supporting calculations showing the geometry and <br />construction sequencing of the proposed excavation slopes. <br />2-09.3(3)D Shoring and Cofferdams <br />Revise the fifth paragraph to read as follows:
The URL can be used to link to this page
Your browser does not support the video tag.