My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 5 – SURFACE TREATMENTS September 12, 2024 <br />AND PAVEMENTS <br />WO No. – UP 3775 SP - 153 <br />other foreign matter. Fill all holes and small depressions with an appropriate class <br />of HMA. Level and thoroughly compact the patched area surface. Obtain <br />Engineer approval of the surface prior to the application of tack coat or paving. <br />Apply an asphalt tack coat to all paved surfaces that HMA is to be placed or <br />abutted; except, that tack coat may be omitted from clean, newly paved surfaces <br />at the Engineer’s discretion. Uniformly apply tack coat to cover the existing <br />pavement with a thin film of residual asphalt free of streaks and bare spots at a <br />rate between 0.02 and 0.10 gallons per square yard of retained asphalt. Obtain <br />application rate approval from Engineer. Apply a heavy application of tack coat to <br />all joints. For Roadways open to traffic, limit the application of tack coat to <br />surfaces that will be paved during the same working shift. Provide spreading <br />equipment equipped with a thermometer to indicate the temperature of the tack <br />coat material. <br />Do NOT allow equipment to operate on tacked surfaces until the tack has broken <br />and cured. Repair tack coat if the Contractor’s operation damages the tack coat <br />prior to placement of the HMA. <br />Provide tack coat consisting of CSS-1 or CSS-1h emulsified asphalt. The CSS-1 <br />and CSS-1h emulsified asphalt may be diluted once with water at a rate not to <br />exceed one part water to one part emulsified asphalt. Provide tack coat having <br />sufficient temperature such that it may be applied uniformly at the specified rate of <br />application and not exceed the maximum temperature recommended by the <br />emulsified asphalt manufacturer. <br />5-04.3(4)A Crack Sealing <br />5-04.3(4)A1 General <br />When the Proposal includes a pay item for crack sealing, seal all cracks 1/4- <br />inch in width and greater. <br />Cleaning: Ensure that cracks are thoroughly clean, dry and free of all loose <br />and foreign material when filling with crack sealant material. Use a hot <br />compressed air lance to dry and warm the pavement surfaces within the <br />crack immediately prior to filling a crack with the sealant material. Do NOT <br />overheat pavement. Do NOT use direct flame dryers. Routing cracks is not <br />required. <br />Sand Slurry: For cracks that are to be filled with sand slurry, thoroughly mix <br />the components and pour the mixture into the cracks until full. Add additional <br />CSS-1 cationic emulsified asphalt to the sand slurry as needed for workability <br />to ensure the mixture will completely fill the cracks. Strike off the sand slurry <br />flush with the existing pavement surface and allow the mixture to cure. Top <br />off cracks that were not completely filled with additional sand slurry. Do NOT <br />place the HMA overlay until the slurry has fully cured. <br />Provide sand slurry consisting of approximately 20 percent CSS-1 emulsified <br />asphalt, approximately 2 percent portland cement, water (if required), and the <br />remainder clean Class 1 or 2 fine aggregate per section 9-03.1(2). <br />Thoroughly mix components and then pour into the cracks and joints until full. <br />The following day, top off any cracks or joints that are not completely filled <br />with additional sand slurry. After the sand slurry is placed, strike off filler flush <br />with the existing pavement surface and allow to cure. Do NOT place the HMA <br />overlay until the slurry has fully cured. The requirements of Section 1-06 will <br />not apply to the portland cement and sand used in the sand slurry. <br />In areas where HMA will be placed, use sand slurry to fill the cracks.
The URL can be used to link to this page
Your browser does not support the video tag.