My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br />3rd Ave Water Quality Facility Division 7 – STORM, SEWER, WATER September 12, 2024 <br />WO No. – UP 3775 SP – 179 <br />The Pretreatment Unit shall be capable of treating the design flow specified without <br />prematurely bypassing flows via an internal bypass or external flow splitter. <br /> <br />The Pretreatment Unit shall be designed with a sump chamber for storage of captured <br />sediments and other captured pollutants. <br /> <br />Hydraulics: <br />The Pretreatment Unit shall convey the flow from the peak storm event of the drainage <br />network, in accordance with required hydraulic upstream conditions as defined by the <br />Engineer. If a substitute treatment unit is proposed, supporting documentation shall be <br />submitted that demonstrates equal or better upstream hydraulic conditions compared to <br />the device specified. This documentation shall include a hydraulic gradeline for the <br />upstream and downstream system and headloss though the treatment unit during the <br />100-year storm. This documentation shall be signed and sealed by a Professional <br />Engineer registered in the State of Washington. All costs associated with preparing and <br />certifying this documentation shall be born solely by the Contractor. <br /> <br />The Pretreatment Unit shall include internal orifice controls to allow the water quality <br />treatment rate of 2.2 cfs (cubic feet per second) through the system without reaching an <br />elevation of 508.9 feet in the upstream stormwater structure, which would divert flow <br />around the Water Quality Treatment Facility. The internal orifice controls shall limit flows <br />rates at higher flow rates to acceptable flow rates to the Water Quality Treatment Facility. <br /> <br />Water Quality Treatment Facility <br />Provide a manufacturer’s certificate of compliance in accordance with Section 1- <br />06.3 demonstrating that the proposed product complies with the following requirements: <br /> <br />The Water Quality Treatment Facility shall has approved General Use Level Designation <br />(GULD) for “Basic, Metals, Phosphorus, and Oil Treatment” from the Washington <br />Department of Ecology. <br /> <br />The Water Quality Treatment Facility shall be sized in accordance with the GULD <br />approved design requirements for the minimum water quality flow rate or 2.2 cfs before <br />bypassing flows through the overflow beehive grate with a peak flow rate of 7.0 cfs as <br />shown in the Plans and specified herein. Exterior dimensions shall fit within the designed <br />footprint of the facility. <br /> <br />Hydraulics: <br />The water quality treatment structure shall treat the flow from the water quality storm <br />event as discharged from the upstream structures and in accordance with required <br />hydraulic conditions. Flows shall be distributed evenly across the top of the water quality <br />treatment media as shown in the Plans. <br /> <br />Diablo Nine Bark shrubs shall be four plants per row with two rows at 12 foot spacing <br />within rows per Medium Strub layout for 4.C in Appendix L. Shrubs shall be planted at <br />a 4ft minimum distance from the perimeter walls and drainage structures, bubblers and <br />cleanouts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.