My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Table of Contents - September 20, 2023 <br />WO No. – UP 3775 SP - i <br /> <br />Table of Contents <br /> <br />Table of Contents ..................................................................................................................... i <br />ADVERTISEMENT FOR BIDS .................................................................................................. 1 <br />DIVISION P - PROPOSAL ........................................................................................................ 3 <br />DIVISION B - BID ITEM DESCRIPTIONS............................................................................... 15 <br />CONTRACT ........................................................................................................................................ 25 <br />PAYMENT BOND ............................................................................................................................... 29 <br />PERFORMANCE BOND ..................................................................................................................... 31 <br />DIVISION 1 – GENERAL REQUIREMENTS ........................................................................... 33 <br />General Description and Location of Project (******) ........................................................................... 33 <br />Design Engineer (******) ..................................................................................................................... 33 <br />Standard Specifications (******) .......................................................................................................... 33 <br />1-01 DEFINITIONS AND TERMS .................................................................................................. 34 <br />1-01.3 Definitions ............................................................................................................................................. 34 <br />1-02 BID PROCEDURES AND CONDITIONS ............................................................................... 38 <br />1-03 AWARD AND EXECUTION OF CONTRACT ......................................................................... 45 <br />1-04 SCOPE OF THE WORK ........................................................................................................ 47 <br />1-05 CONTROL OF WORK ........................................................................................................... 53 <br />1-06 CONTROL OF MATERIAL ..................................................................................................... 71 <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ......................................... 72 <br />1-08 PROSECUTION AND PROGRESS ....................................................................................... 89 <br />1-09 MEASUREMENT AND PAYMENT ....................................................................................... 108 <br />1-10 TEMPORARY TRAFFIC CONTROL .................................................................................... 126 <br />1-11 MISCELLANEOUS (******) ................................................................................................... 131 <br />DIVISION 2 – EARTHWORK ................................................................................................ 133 <br />2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP ........................................................ 133 <br />2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS ....................................................... 133 <br />2-03 ROADWAY EXCAVATION AND EMBANKMENT ................................................................. 137 <br />2-04 HAUL ................................................................................................................................... 138 <br />2-07 WATERING .......................................................................................................................... 139 <br />2-09 STRUCTURE EXCAVATION ................................................................................................ 140 <br />2-11 TRIMMING AND CLEANUP................................................................................................. 141 <br />DIVISION 4 - BASES ............................................................................................................ 143 <br />4-04 BALLAST AND CRUSHED SURFACING ............................................................................. 143 <br />4-06 ASPHALT TREATED BASE (ATB) ....................................................................................... 143 <br />DIVISION 5 – SURFACE TREATMENTS AND PAVEMENTS .............................................. 147 <br />5-04 HOT MIX ASPHALT ............................................................................................................. 147
The URL can be used to link to this page
Your browser does not support the video tag.