My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 11:26:57 AM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Table of Contents - September 20, 2023 <br />WO No. – UP 3775 SP - i <br /> <br />Table of Contents <br /> <br />Table of Contents ..................................................................................................................... i <br />ADVERTISEMENT FOR BIDS .................................................................................................. 1 <br />DIVISION P - PROPOSAL ........................................................................................................ 3 <br />DIVISION B - BID ITEM DESCRIPTIONS............................................................................... 15 <br />CONTRACT ........................................................................................................................................ 25 <br />PAYMENT BOND ............................................................................................................................... 29 <br />PERFORMANCE BOND ..................................................................................................................... 31 <br />DIVISION 1 – GENERAL REQUIREMENTS ........................................................................... 33 <br />General Description and Location of Project (******) ........................................................................... 33 <br />Design Engineer (******) ..................................................................................................................... 33 <br />Standard Specifications (******) .......................................................................................................... 33 <br />1-01 DEFINITIONS AND TERMS .................................................................................................. 34 <br />1-01.3 Definitions ............................................................................................................................................. 34 <br />1-02 BID PROCEDURES AND CONDITIONS ............................................................................... 38 <br />1-03 AWARD AND EXECUTION OF CONTRACT ......................................................................... 45 <br />1-04 SCOPE OF THE WORK ........................................................................................................ 47 <br />1-05 CONTROL OF WORK ........................................................................................................... 53 <br />1-06 CONTROL OF MATERIAL ..................................................................................................... 71 <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ......................................... 72 <br />1-08 PROSECUTION AND PROGRESS ....................................................................................... 89 <br />1-09 MEASUREMENT AND PAYMENT ....................................................................................... 108 <br />1-10 TEMPORARY TRAFFIC CONTROL .................................................................................... 126 <br />1-11 MISCELLANEOUS (******) ................................................................................................... 131 <br />DIVISION 2 – EARTHWORK ................................................................................................ 133 <br />2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP ........................................................ 133 <br />2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS ....................................................... 133 <br />2-03 ROADWAY EXCAVATION AND EMBANKMENT ................................................................. 137 <br />2-04 HAUL ................................................................................................................................... 138 <br />2-07 WATERING .......................................................................................................................... 139 <br />2-09 STRUCTURE EXCAVATION ................................................................................................ 140 <br />2-11 TRIMMING AND CLEANUP................................................................................................. 141 <br />DIVISION 4 - BASES ............................................................................................................ 143 <br />4-04 BALLAST AND CRUSHED SURFACING ............................................................................. 143 <br />4-06 ASPHALT TREATED BASE (ATB) ....................................................................................... 143 <br />DIVISION 5 – SURFACE TREATMENTS AND PAVEMENTS .............................................. 147 <br />5-04 HOT MIX ASPHALT ............................................................................................................. 147
The URL can be used to link to this page
Your browser does not support the video tag.