My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Blue Mountain Construction Group, LLC 11/19/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Blue Mountain Construction Group, LLC 11/19/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2025 4:40:41 PM
Creation date
11/19/2024 11:14:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Blue Mountain Construction Group, LLC
Approval Date
11/19/2024
Council Approval Date
11/6/2024
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
3rd Ave Water Quality Facility
Tracking Number
0004585
Total Compensation
$610,415.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Blue Mountain Construction 9/30/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
422
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br />3rd Ave Water Quality Facility Division 1 – GENERAL REQUIREMENTS September 20, 2024 <br />WO No – UP3775 SP – 36 <br />Contract Documents: All of the items that together make up the complete Contract. <br />See definition for “Contract.” <br />Contract Execution Date: The date the Mayor of the City of Everett signs the Contract <br />or the date that the Contractor signs the Contract, whichever date is later. This officially <br />binds the Contractor to the Contract. <br />Contract Sum: The price in dollars stated in the Contract to be paid by the City to the <br />Contractor for the Work described in the Contract Documents, as modified by Change <br />Orders. <br />Contract Time: The period of time established by the terms and conditions of the <br />Contract within which the Work must be physically completed. <br />COVID-19: Disease related to the novel coronavirus (SARS-CoV-2), which is the <br />subject of Governor’ Inslee’s proclamation dated February 29, 2020, and subsequent <br />proclamations. <br />COVID-19 Requirements: All governmental laws, regulations, requirements, and <br />orders relating to COVID-19, including without limitation OSHA, L&I or other safety <br />rules relating to COVID-19 and COVID-19 gubernatorial proclamations and orders. <br />Delay: Any increase in the duration of the critical path of the Project. <br />Dispute: Any controversy or disagreement. <br />Equipment: Mechanical, electrical, instrumentation, or other devices with one or more <br />moving parts, or devices requiring an electrical, pneumatic, electronic, or hydraulic <br />connection. <br />Extended Overhead: The increase in Overhead costs attributable to an extension of <br />Contract Time. <br />Extra Work: Providing materials and Equipment and the performance of Work not <br />directly called for in, or implied by, the Contract Documents, such that Contractor would <br />be entitled to an adjustment of Contract Sum and possibly an extension of Contract <br />Time. <br />Final Acceptance: Formal action by Everett City Council determining that all of the <br />Contractor's Work has been completed, except for any landscaping maintenance. <br />Float: The amount of time between the early start date and the late start date, or the <br />early finish date and the late finish date of an activity in the Project schedule. <br />Force Account: Costs of performing Work as defined in 1-09.6 FORCE ACCOUNT. <br />Furnish: To deliver items, Equipment, or material to the job site or other specified <br />location. <br />Install: Placing, erecting, or constructing complete in place items, Equipment, or <br />material. <br />May: Conduct that is permitted, but not required. <br />Notice: A signed, written communication by the Contractor to the City as described in <br />1-04.5 NOTICE BY CONTRACTOR of these Special Provisions. <br />Notice of Award: The written notice from the City of Everett to the successful Bidder <br />signifying the City’s acceptance of the Bid. No Contract is formed until the Contract <br />Execution Date. <br />Notice to Proceed: The written Notice from the City or City’s Representative to the <br />Contractor authorizing and directing the Contractor to proceed with the Work and <br />establishing the date on which the Contract Time begins. Multiple and partial Notices to <br />Proceed may be issued on a single Project.
The URL can be used to link to this page
Your browser does not support the video tag.